My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
B
>
BENJAMIN HOLT
>
0
>
2900 - Site Mitigation Program
>
PR0546415
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/22/2026 11:08:16 AM
Creation date
4/22/2026 10:54:25 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0546415
PE
2960 - RWQCB LEAD AGENCY CLEAN UP SITE
FACILITY_ID
FA0026300
FACILITY_NAME
LINCOLN CENTER ENVIRONMENTAL REMEDIATION TRUST
STREET_NUMBER
0
Direction
W
STREET_NAME
BENJAMIN HOLT
STREET_TYPE
DR
City
STOCKTON
Zip
95207
APN
09741079
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\gmartinez
Supplemental fields
Site Address
W BENJAMIN HOLT DR STOCKTON 95207
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
167
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Geosyntec'-' <br /> consultants <br /> INTRODUCTION <br /> This site-specific Health and Safety Plan (HASP) was prepared to address project-specific <br /> hazards known or suspected to be present associated with the existing conditions and work to be <br /> performed at the work site(s). This HASP was prepared to meet the requirements specified in <br /> Occupational Safety and Health (OSHA) Hazardous Waste Operations Emergency and Response <br /> (HAZWOPER)program, Geosyntec's Health and Safety(H&S)Procedure HS 301, and the H&S <br /> requirements of the client. <br /> 1. SIGNATURES <br /> 1.1 Preparers and Reviewers <br /> This HASP must be maintained on site when field work is being performed. The Site Health and <br /> Safety Officer (SHSO) can change or amend this document, in agreement with the Health and <br /> Safety Coordinator (HSC) or Project Manager. Amendments (e.g., changes in personal <br /> protective equipment, addition of tasks, etc.) must be documented in Section 18 and in <br /> Appendix A. This HASP must be reviewed and amended on an annual basis for projects lasting <br /> more than one year. <br /> Prepared by: <br /> SHSO—Katherine Clark <br /> Reviewed by: <br /> HSC—Richard Hodges <br /> Approved by: <br /> Project Manager—Jamie Purcell Date <br /> This HASP has been given to the following H&S approved subcontractor(s). <br /> Subcontractor: Representative: Date: <br /> Subcontractor: Representative: Date: <br /> Subcontractor: Representative: Date: <br /> SAC 111 HASP-June 2023 1 6/23/2023 <br />
The URL can be used to link to this page
Your browser does not support the video tag.