My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
B
>
BENJAMIN HOLT
>
0
>
2900 - Site Mitigation Program
>
PR0546415
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/22/2026 11:08:16 AM
Creation date
4/22/2026 10:54:25 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0546415
PE
2960 - RWQCB LEAD AGENCY CLEAN UP SITE
FACILITY_ID
FA0026300
FACILITY_NAME
LINCOLN CENTER ENVIRONMENTAL REMEDIATION TRUST
STREET_NUMBER
0
Direction
W
STREET_NAME
BENJAMIN HOLT
STREET_TYPE
DR
City
STOCKTON
Zip
95207
APN
09741079
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\gmartinez
Supplemental fields
Site Address
W BENJAMIN HOLT DR STOCKTON 95207
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
167
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Geosyntec'-' <br /> consultants <br /> 10. TAILGATE MEETINGS <br /> Tailgate meetings must be held daily prior to starting work to discuss important health and safety <br /> issues concerning tasks to be performed during that shift. Non-Geosyntec site workers should <br /> also communicate health and safety concerns associated with the tasks they will be performing. <br /> Topics discussed in the tailgate meetings must be documented. <br /> 11. STOP WORK AUTHORITY <br /> In accordance with the Company's Procedure HS 203 - Stop Work Authority, Geosyntec <br /> personnel and subcontractor personnel have the authority and responsibility to issue a Stop Work <br /> Order if unsafe actions and/or conditions are identified. The Stop Work Authority (SWA) <br /> process involves a stop, notify, correct, and resume approach for resolving observed unsafe work <br /> actions or conditions. The person issuing the work stoppage will first notify workers engaged in <br /> or affected by the unsafe activity or condition and require that associated work be stopped. After <br /> this Stop Work Order is issued, the Geosyntec project manager and the supervisors for affected <br /> or concerned contractors will also be notified. The Geosyntec project manager will document <br /> the issuance of the Stop Work Order on the form provided in Procedure HS 203. Work will not <br /> resume until the issues and concerns of the Stop Work Order have been adequately addressed. <br /> 12. AIR MONITORING <br /> APPLIES TO TASK: ❑ i0 ❑T ❑03 ❑® ❑Os ❑© ❑T ❑® ® Not Applicable <br /> Air monitoring will be performed to evaluate airborne chemical and/or dust exposure levels <br /> within the breathing zone of site workers. Hazardous conditions may include concentrations that <br /> may cause acute or chronic illness, potential oxygen deficient environments, or potential <br /> explosive environments. Air monitoring may also be performed to evaluate the adequacy of <br /> engineering, administrative, and/or PPE controls. Air monitoring may be "real-time" (e.g., the <br /> instrument provides immediate results at the project), using multi-gas meters, photoionization <br /> detectors (PIDs), or colorimetric tubes. Personal monitoring may also be performed by collecting <br /> samples and forwarding to a laboratory for analysis and quantification. <br /> The type(s) of air monitoring equipment required and associated action levels are outlined in <br /> Appendix D. Monitoring equipment must be calibrated based on the manufacturer's <br /> requirements. Calibration results and air monitoring measurements must be documented. Based <br /> on the results noted and site activities or scope of work changes, the frequency of air monitoring <br /> may be adjusted on site by the SHSO with the consent of the Project Manager and <br /> communication with the HSC. <br /> SAC 111 HASP-June 2023 16 6/23/2023 <br />
The URL can be used to link to this page
Your browser does not support the video tag.