My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
B
>
BENJAMIN HOLT
>
0
>
2900 - Site Mitigation Program
>
PR0546415
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/22/2026 11:08:16 AM
Creation date
4/22/2026 10:54:25 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0546415
PE
2960 - RWQCB LEAD AGENCY CLEAN UP SITE
FACILITY_ID
FA0026300
FACILITY_NAME
LINCOLN CENTER ENVIRONMENTAL REMEDIATION TRUST
STREET_NUMBER
0
Direction
W
STREET_NAME
BENJAMIN HOLT
STREET_TYPE
DR
City
STOCKTON
Zip
95207
APN
09741079
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\gmartinez
Supplemental fields
Site Address
W BENJAMIN HOLT DR STOCKTON 95207
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
167
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
operator and/or helper to determine when safe to approach <br /> machinery. <br /> • Wear level D PPE when handling soil or water. <br /> • Keep high pressure nozzles pointed away from face and body, <br /> even when not in use.Wear protective eyewear during use <br /> C.2. SAFETY EQUIPMENT LIST(Gear to be brought to the worksite by Geosyntec personnel,or availability confirmed) <br /> Site-Specific Notes,Clarifications: <br /> ® ;WEATHER, N Project-provided drinking water N Sunscreen ❑Rock salt,traction sand <br /> CLIMATE, N Canopy for shade,weather protection ❑Ice creepers(boot attachments) ❑Portable heater(electric or kerosene) <br /> ..................................................................................................................................................................................................................................................................................................................................:......................................................................................................................................................... <br /> I SEASONAL 1 ❑Other: <br /> HYGIENE ❑Hand washing equipment(soap&wash water) ❑Hand sanitizer,disinfectant supplies El Sanitary facility,Aorta toilet <br /> ❑ >................................................................................................................................................................................................................................................................................................................................:......................................................................................................................................................... <br /> PROVISIONS ❑Other: <br /> ® :BASIC PPE N Standard work clothes appropriate for task N Safety glasses N High-visibility/reflective vest/apparel <br /> N Hard toed boots/shoes N Work gloves appropriate for task N Nuisance dust mask(voluntary use <br /> N Hardhat N Noise/hearing protection <br /> ® :BIOLOGICAL N Insect control(permethrin,repellant,wasp spray,other) ❑Animal warning device(for bears/cougars/wolves/large animals) <br /> HAZARDS ❑Poison ivy protection(Ivy Block skin cream,Tecnu skin wash) N Hand sanitizer(for general hygiene or COVID-19) <br /> El Tick removal kit N Disinfectant supplies(for general hygiene or COVID-19) <br /> ❑Pant-leg"blousing"/gaiters(tick safe) El Face covers for COVID-19 prevention <br /> ❑Snake chaps/gaiters <br /> ........................................................................................................................................................................................................................................................................................................................................................................................................................................................................................... <br /> ❑Other: <br /> ® SPECIAL ElPortable GFCI(s)for shock protection ❑Lockout/tagout equipment ❑Personal fall protection apparatus <br /> HAZARD ❑Electrical-hazard-rated boots,gloves ❑Portable lighting ❑Personal flotation device <br /> CONTROLS I ❑Arc-resistant(AR)protection PPE for arc flash € ❑Tripod/winch ❑Ring buoy&rope <br /> ❑Flame-resistant(FR)clothing ❑Ventilation equipment(fan,blower) ElMarine survival suit <br /> N Work-area delineation supplies N Traffic control devices <br /> .......................................................................................................................................................................................................................................................................................................................................................................................................................................................................................... <br /> ❑Other: <br /> ❑ :CHEMICAL PPE ❑Goggles and/or face shield ❑Disposable N95 respirator ❑Decon solution,related supplies <br /> and CHEMICAL ❑Chemical protective gloves ❑Half-face respirator(APR),cartridges ❑Receptacle for disposable PPE <br /> SAFETY GEAR ❑Coveralls(Tyvek,or other) ❑Full-face respirator(APR),cartridges ❑Chemical hazard emergency gear—listed <br /> ❑Outer boots,boot covers ❑Exclusion Zone delineation supplies in"EMERGENCY EQUIPMENT"below <br /> ............................................................................................................................................................................................................................................................................................................................................................... <br /> El Air monitoring equipment,worker exposure monitoring device(s): <br /> ❑Other: <br /> ® :EMERGENCY ❑Air horn,alarm,alerting equipment ❑Eyewash bottle(s) Vehicle emergency preparedness: <br /> EQUIPMENT El 2-Way radios;other communication device ❑15-min.eyewash station El Fire extinguisher,first aid kit <br /> N First aid kit(s)—onsite and/or in vehicles ElEmergency deluge shower El Flares,lights,reflective device <br /> N Fire extinguisher—onsite and/or in vehicles ❑Chemical spill kit/supplies N Roadside assistance service <br /> ................................................................................................................................................................................................................................................................................................................................:......................................................................................................................................................... <br /> Other: <br /> PART D- HAZARD ANALYSIS AND CONTROLS <br /> D.1. ROUTINE HAZARD PREPAREDNESS (This section required for all Tasks) <br /> Site-Specific Notes&Clarifications: <br /> Routine Driving Hazards <br /> N Routine work travel—Use routine safe/defensive driving practices(seat belts,safe speeds,eyes ahead,no tailgating,limit distractions,safe cell phone use, <br /> no texting,clear windows,account for weather/road conditions,adequate sleep,other measures as appropriate). <br /> N Unfamiliar location—Plan travel route before driving in roadway:view map,plot your route and/or enter destination and activate navigation device. <br /> N Fatigue—Minimize fatigue during long drives:frequent rest breaks,eat light snacks-avoid heavy meals,stay hydrated,fresh air,no loud music,keep <br /> windshield clean;avoid/minimize long distance driving during your ordinary sleep hours;total work time and drive time should not exceed 14 hours per day. <br /> N Unfamiliar vehicle—Become familiar with vehicle operational controls and handling characteristics before operating vehicle. <br /> Geosyntec Procedures: HS-105-Driver and Vehicle Safety;HS-211-Fatigue Management Plan <br /> Project/Task Name: <br /> Geosyntec THA Date: Page 2 <br /> consultants <br />
The URL can be used to link to this page
Your browser does not support the video tag.