Laserfiche WebLink
Sampling and Analysis Plan ��� <br /> Port of Stockton—Rail and Bridge,Stockton,CA <br /> Table of Contents <br /> 1 Introduction ................................................................................................................................ 1 <br /> 1.1 Site Description ................................................................................................................ 1 <br /> 1.2 Sampling and Analysis Objective ..................................................................................... 1 <br /> 2 Sampling Rationale....................................................................................................................2 <br /> 2.1 Health and Safety.............................................................................................................2 <br /> 3 Investigation Approach and Methods......................................................................................... 3 <br /> 3.1 Right of Entry, Permitting and Utility Clearance................................................................ 3 <br /> 3.2 Sampling and Analytical Methods..................................................................................... 3 <br /> 3.2.1 Soil Sampling and Analysis.................................................................................. 3 <br /> 3.2.2 Groundwater Sampling and Analysis ...................................................................4 <br /> 3.2.3 Lead Paint and Asbestos Sampling and Analysis ................................................4 <br /> 3.2.4 Boring Decommission and Survey ....................................................................... 5 <br /> 3.2.5 Equipment Decontamination ................................................................................5 <br /> 3.2.6 Management of Investigation Derived Waste....................................................... 5 <br /> 3.2.7 Pollution Prevention ............................................................................................. 5 <br /> 3.3 Quality Control..................................................................................................................5 <br /> 3.3.1 Sample Identification............................................................................................ 5 <br /> 3.3.2 Field Quality Control Samples.............................................................................. 6 <br /> 4 Reporting ...................................................................................................................................6 <br /> 5 References.................................................................................................................................8 <br /> Tables <br /> Table 1.1 Sample Locations and Sampling Rationale <br /> Table 2.1 Schedule of Soil Analyses <br /> Table 2.2 Schedule of Groundwater Analyses <br /> Table 2.3 Schedule of Lead Based Paint and Asbestos Analyses <br /> Table 2.4 Sample Containers, Preservation, Holding Times, and Analytical Methods <br /> Table 3.1 Screening Levels for Soil Analytes <br /> Table 3.2 Screening Levels for Groundwater Analytes <br /> Table 3.3 Screening Levels for Lead-Based Paint and Asbestos <br /> Figures <br /> Figure 1.0 Site Location Map <br /> Figure 2.0 Reference Area Key Map <br /> Figure 2.1 Referepnce Area 1 Planned Sample Locations <br /> Figure 2.2 Reference Area 2 Planned Sample Locations <br /> Figure 2.3 Reference Area 3 Planned Sample Locations <br /> Figure 2.4 Reference Area 4 Planned Sample Locations <br /> Figure 2.5 Lead Based Paint and Asbestos Containing Materials Planned Sample Locations <br /> September 8,2023 1 i <br />