Laserfiche WebLink
Phase II Sampling and Analysis Plan SOP-2—Drilling and Sampling <br /> Port of Stockton-Rail and Bridge,Stockton,CA FN <br /> 6 Procedures <br /> 6.1 Start-Up Activities <br /> 6.1 .1 Office <br /> Prior to leaving the office for field work, personnel will perform the following actions: <br /> 1. The Project Manager (PM)will assign a FTL to direct field activities and coordinate with <br /> project personnel. Task specific responsibilities of the FTL will be addressed in the <br /> appropriate SOP; general responsibilities include: <br /> a. Review work plan and HASP, and for subcontracted work, review of the subcontract <br /> agreement. <br /> b. Work with PM to properly staff the field activity. <br /> c. Locate the proposed drilling locations and mark each location with a wooden stake and <br /> white flagging or white paint. <br /> d. Notify the 811 utility location and, if necessary, a private utility location service. <br /> e. Coordinate sampling activities and supplies with the project chemist and analytical <br /> laboratory. <br /> f. Confirm availability and condition of HDR-owned equipment and order additional <br /> equipment/supplies for delivery prior to the start of each event. <br /> g. Prepare field forms and other documentation for the planned event. <br /> h. Provide HDR and subcontracted field personnel with time and location for personnel to <br /> meet prior to beginning field activities. <br /> i. Confirm that field staff have a valid Driver's License (or other picture identification) in <br /> their possession prior to leaving the office and current OSHA Certification. <br /> 6.1 .2 Field <br /> After arrival on site, but prior to commencement of operations, the following activities will be <br /> performed: <br /> • Complete equipment and supply checklists and verify that required documentation and <br /> equipment for drilling and soil sampling activities are on site. <br /> • Review condition of HDR-owned and rental equipment; inventory field supplies and <br /> laboratory-provided sampling supplies. <br /> • Confirm drilling and soil sampling locations are clearly marked and review locations for <br /> hazards; determine if the utility locators have adequately marked utilities on the site. Check <br /> for overhead dangers such as power lines and make necessary height measurements to <br /> ensure safe clearance distances are maintained. <br /> • Determine requirements for site preparation and clearance and select location for the <br /> placement of the decontamination area, storage of decontamination waters, and soil cuttings. <br /> • Confirm locations and requirements for each sample to be collected. <br /> 2-4 <br />