Laserfiche WebLink
Soil Sampling Using Direct Push SOP <br /> leading edge. <br /> 5. Carefully cut the liner open, using a liner cutter. By cutting the sample liner along two <br /> sides, the sample can be exposed. <br /> 6. Fill the appropriate sample jars using the material from the open sample liner, excluding <br /> the upper zone three-inches. <br /> 7. Describe the sample lithology(ies) in accordance with Geological Observations SOP. <br /> 8. Collect samples for VOC analysis in accordance with VOC Sample Collection SOP. <br /> 9. Collect QC samples in accordance with QA/QC Sample Collection SOP. <br /> 10. Remove any soil from the threads. Tighten the caps securely on the sample jars and/or <br /> air- tight containers (e.g. EnCore). <br /> 11. Place collected samples in a cooler with ice in accordance with Sample Packaging and <br /> Shipping SOP. Complete a Chain-of-Custody record in accordance with Completing <br /> Chain of Custody SOP. <br /> 12. Record the appropriate information in the Boring Log (Attachment 2) and in the field <br /> logbook in accordance with Fieldwork Documentation SOP. <br /> If applicable and initial screening results indicate the presence of organic vapors, a headspace <br /> analysis shall be conducted on remaining portions of the sample in accordance with the <br /> Headspace Analysis SOP. <br /> The sampling equipment shall be decontaminated between each sample, and new nitrile <br /> gloves shall be worn each time, in accordance with Equipment Decontamination SOP. <br /> 8.0 Data and Records Management: <br /> Before finalizing fieldwork documentation: <br /> • Recheck all data inputs to prevent errors. <br /> • If data were generated from multiple/different sample locations (borings,wells, etc.)at <br /> the same site,use appropriate file naming conventions to distinguish one file from <br /> another. <br /> • Ensure that any repair work needed, issues to be resolved, and/or any uncompleted <br /> fieldwork are noted in the fieldwork documentation. <br /> Upon completion of fieldwork, field personnel shall file fieldwork documentation, any electronic <br /> field files, the Site Health and Safety Plan, and any associated health and safety forms to the <br /> correct project folder, in accordance with Control of Records SOP. <br /> 9.0 Quality Control: <br /> • All data, observations, calculations must be documented in the field logbook, field forms, <br /> and/or any electronic data recording devices (field computers, digital cameras, tablet, <br /> mobile phones, etc.). <br /> • Adequate traceability must be ensured between any field notes and complementary field <br /> forms. <br /> • Any electronic data recording devices must be operated in accordance with <br /> manufacturer's operating instructions, unless documented otherwise. <br /> • Monitoring and Measuring Equipment must be calibrated prior to the event and <br /> Control#:AG-10040-00 Page 6 of 8 <br /> File name:Soil Sampling Using Direct Push SOP <br />