My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2026
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
G
>
GRANT LINE
>
2185
>
2200 - Hazardous Waste Program
>
PR0524323
>
COMPLIANCE INFO_2026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/30/2026 1:51:26 PM
Creation date
5/6/2026 2:26:07 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2200 - Hazardous Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
2026
RECORD_ID
PR0524323
PE
2220 - SM HW GEN <5 TONS/YR
FACILITY_ID
FA0016313
FACILITY_NAME
KAISER PERMANENTE
STREET_NUMBER
2185
Direction
W
STREET_NAME
GRANT LINE
STREET_TYPE
RD
City
TRACY
Zip
95377
APN
21402029
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
Site Address
2185 W GRANT LINE RD TRACY 95377
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Hazardous Materials & Waste Contingency Plan <br /> Kaiser Permanente Tracy Medical office <br /> 1/01/2026 - 12/31/2026 <br /> (b) Storage area description with storage methods utilized,including duration and <br /> temperature,if applicable. <br /> • The facility maintains a secured area for storage of hazardous waste pending disposal <br /> preventing unauthorized entry. <br /> • The storage area is marked with warnings that read in English and Spanish <br /> "Danger Hazardous Waste Accumulation Area—Unauthorized Personnel Keep Out". <br /> These signs are legible from a distance of at least 25 feet. <br /> • Hazardous waste storage area is protected from exposure to sun and rain. <br /> • Secondary containment is required for hazardous waste. <br /> • Hazardous waste shall not be stored on-site for more than 90 days prior to disposal. <br /> (c) Registered hazardous waste The alternate hazardous waste hauler is: <br /> hauler is: <br /> • Clean Harbors • Ramos Environmental Services, Reg.No. <br /> Environmental Services 0518 <br /> 1030 Commercial Street, 1515 South River rd <br /> Suite 107 West Sacramento, CA 95691 <br /> San Jose, CA 95112 (916)371-5747 <br /> (916)375-2611 x2036 <br /> • Additional Waste haulers will be contacted in the event the alternate medical waste <br /> hauler is unavailable[List of additional waste hauler contacts are located inside <br /> Hazardous Waste Manifest Binder managed by Environmental Services(EVS) <br /> department]. <br /> (d) Do you have tracking documents for all hazardous waste handled at your facility? <br /> • The Kaiser Compliance document for record keeping states Manifest <br /> documentation must be kept for life! Uniformed hazardous waste manifest and <br /> land disposal restriction(LDR)forms will be retained permanently. <br /> (e) Describe your hazardous waste emergency action plan,including procedures for <br /> handling spills,exposures,equipment failures,etc. <br /> The Contingency Plan shall be carried out immediately whenever there is a fire, explosion, <br /> spill or release of hazardous material/waste or hazardous material/waste constituents to the <br /> air,soil or surface water which could threaten human health or the environment. This plan <br /> minimizes the hazards to human health and the environment that may occur as a result of <br /> emergencies involving hazardous materials/wastes. The regulations that specify the <br /> contingency plan requirements are found in the California Code of Regulations(CCR), Title <br /> 22, Chapter 15, Article 4, beginning with §66265.50. <br /> As a generator that stores hazardous waste on-site, we are required to complete the <br /> contingency plan. We are to keep one copy of the plan and submit a copy of the plan to each <br /> agency that may provide emergency response to our facilities. The plan must be revised <br /> whenever the plan fails during an emergency,the facility changes,the contents of the plan <br /> change or the regulations change. <br /> The Emergency Coordinator(Safety Officer) has authority to implement the contingency <br /> plan. In the event of an emergency,the following personnel shall take responsibility as <br /> Tracy MOB Page 2 of 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.