My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2026
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WEST
>
3300
>
2300 - Underground Storage Tank Program
>
PR0231289
>
COMPLIANCE INFO_2026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/12/2026 8:43:06 PM
Creation date
5/18/2026 11:33:57 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2026
RECORD_ID
PR0231289
PE
2361 - UST FACILITY
FACILITY_ID
FA0003847
FACILITY_NAME
NORCAL FUELS
STREET_NUMBER
3300
Direction
N
STREET_NAME
WEST
STREET_TYPE
LN
City
STOCKTON
Zip
95204
APN
11705037
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
Site Address
3300 N WEST LN STOCKTON 95204
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Underground Storage Tank <br /> Monitoring System Certification Form <br /> 10. MONITORING SITE PLAN <br /> Date site plan was prepared. <br /> If a site plan has been prepared that shows all required information, you may include it, rather than this page, <br /> with your Monitoring System Certification Form. The site plan must show the general layout of tanks and <br /> identify locations of the monitoring panel, and all leak detection equipment and monitoring locations. Include <br /> a legend for all symbols depicted. <br /> I'S-V,—,,I.I fla ;it&F13!1 <br /> SMAddress: RTSTL.ANL rITL 3200 NVMLA`E STOCIiTON CA 95.P4 <br /> KEY <br /> A=.--Nn AR Sensor <br /> F—rELLS <br /> V=V_MR <br /> P=PROBE <br /> L—Turblae;Leak Detector <br /> X=SUMP SENSOR <br /> B=Brine Sensor <br /> S—Smart Sensor <br /> C=Floats&C'l.a®s <br /> E=E Stop <br /> ;PFMG <br /> NEb� . . (aRAOnS) <br /> PV <br /> Lhaw-mg of piputg <br /> eat of sump and .d <br /> O.O. UDC's No <br /> underground <br /> dranmm is accurate <br /> ,a,e cannot <br /> TLS 35O speculate blue <br /> prints. <br /> ) y <br /> . . . . . . <br /> 87 91 C C <br /> TL C . C <br /> P F C A V F P <br /> X <br /> WESTLANE <br /> _irp i+cnc ura$rrrarad+kcr mc rrd�iribla to+Jrc cw-ty[irrg t cbridarr wa a <br /> pgfes:iaralopraonor�iarrfoa:dshfcr'r�ot»atcrnlprrpatr. Dratrrrrg <br /> trotto:cde <br /> Date map was drawn:7t27121 <br /> Iosbvctioes <br /> If you already have a diagram that shorn all requied information.you may include it,rather than this page,with your Monitoring System Certification. On your site plan, <br /> chow the general lato pi ut of tars and p Clomly identify to ationt of the folowing equipment,f installed monitorw.g cyctem control pansi cormom monitoring tank <br /> annular spaces,sumps.dispenser pans,spill containers,or other secondary containment areas:mechanicalor electrum line leak detesters;and in-tank liquid level <br /> probes(if used for leak detection). In the space provided,note the date this Site Plan was prepared. <br /> Page 6 of 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.