My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU-2601294
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CLARKSDALE
>
4910
>
2600 - Land Use Program
>
SU-2601294
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/22/2026 11:18:34 AM
Creation date
5/20/2026 1:38:36 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU-2601294
PE
2622 - SUBDIVISON - MINOR (MS)
STREET_NUMBER
4910
Direction
E
STREET_NAME
CLARKSDALE
STREET_TYPE
RD
City
ACAMPO
Zip
95220
APN
01709059
CURRENT_STATUS
Closed - Issued
QC Status
Approved
Scanner
SJGOV\gmartinez
Supplemental fields
Site Address
4910 E CLARKSDALE RD ACAMPO 95220
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2ISJC' 0 �_' , 1 nc: . <br /> ® SJMSCP Incidental Take Minimization Measures and mitigation requirement: <br /> 1. Incidental Take Minimization Measures(ITMMs)will be issued to the project and must be signed by the project applicant prior to ally <br /> ground disturbance but no later than six (6) months from receipt of the ITMMs. If ITMMs are not signed within six months, the applicant <br /> must reapply for SJMSCP Coverage. Upon receipt of signed ITMMs from project applicant, SJCOG, Inc. staff will sign the ITMMs. This <br /> is the effective date of the ITMMs. <br /> 2. Under no circumstance shall ground disturbance occur without compliance and satisfaction of the ITMMs. <br /> 3. Upon issuance of fully executed ITMMs and prior to any ground disturbance, the project applicant must <br /> a. Post a bond for payment of the applicable SJMSCP fee covering the entirety of the project acreage being covered (the bond <br /> should be valid for no longer than a 6 month period); or <br /> b. Pay the appropriate SJMSCP fee for the entirety of the project acreage being covered; or <br /> C. Dedicate land in-lieu of fees, either as conservation easements or fee title; ol- <br /> d. Purchase approved mitigation bank credits. <br /> 4. Within 6 months from the effective date of the ITMMs or issuance of a building permit, whichever occurs first, the project applicant must: <br /> a. Pay the appropriate SJMSCP for the entirety of the project acreage being covered; or <br /> b. Dedicate land in-lieu of fees, either as conservation easements or fee title; or <br /> C. Purchase approved mitigation bank credits. <br /> Failure to satisfy the obligations of the mitigation fee shall subject the bond to be called. <br /> ® Receive your Certificate of Payment and release the required permit <br /> It should be noted that if this project has any potential impacts to waters of the United States (pursuant to Section 404 Clean Water Act], <br /> it would require the project to seek voluntary coverage through the unmapped process under the SJMSCP which could take up to 90 <br /> days. It may be prudent to obtain a preliminary wetlands map from a qualified consultant. If waters of the United States are confirmed on <br /> the project site, the Corps and the Regional Water Quality Control Board (RWQCB) would have regulatory authority over those mapped <br /> areas [pursuant to Section 404 and 401 of the Clean Water Act respectively] and permits would be required from each of these resource <br /> agencies prior to grading the project site. <br /> If you have any questions, please call (209) 235-0574. <br />
The URL can be used to link to this page
Your browser does not support the video tag.