My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU-2601207
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WEST RIPON
>
10858
>
2600 - Land Use Program
>
SU-2601207
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/27/2026 3:49:28 PM
Creation date
5/28/2026 4:35:44 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU-2601207
PE
2634 -ZONING COMPLIANCE REVIEW - MINOR (Z)
STREET_NUMBER
10858
Direction
E
STREET_NAME
WEST RIPON
STREET_TYPE
RD
City
RIPON
Zip
95366
APN
25724061
CURRENT_STATUS
Closed - Issued
QC Status
Approved
Scanner
SJGOV\gmartinez
Supplemental fields
Site Address
10858 E WEST RIPON RD RIPON 95366
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Pavifir,Gas aaad <br /> Electric Company <br /> 11. Cathodic Protection: PG&E pipelines are protected from corrosion with an"Impressed <br /> Current"cathodic protection system.Any proposed facilities,such as metal conduit, pipes, <br /> service lines,ground rods, anodes,wires, etc.that might affect the pipeline cathodic protection <br /> system must be reviewed and approved by PG&E Corrosion Engineering. <br /> 12. Pipeline Marker Signs: PG&E needs to maintain pipeline marker signs for gas <br /> transmission pipelines in order to ensure public awareness of the presence of the pipelines. <br /> With prior written approval from PG&E Pipeline Services,an existing PG&E pipeline marker sign <br /> that is in direct conflict with proposed developments may be temporarily relocated to <br /> accommodate construction work. The pipeline marker must be moved back once construction is <br /> complete. <br /> 13. PG&E is also the provider of distribution facilities throughout many of the areas within <br /> the state of California.Therefore, any plans that impact PG&E's facilities must be reviewed and <br /> approved by PG&E to ensure that no impact occurs which may endanger the safe operation of <br /> its facilities. <br /> PG&E Gas and Electric Facilities Page 4 <br /> Internal <br />
The URL can be used to link to this page
Your browser does not support the video tag.