Laserfiche WebLink
Universal Health & Safety Plan <br /> For use on all high-risk,industrial and HAZWOPER projects <br /> Department of Toxic Substances Control <br /> 4.2 Emergency Planning <br /> AECOM requires that all projects plan for reasonably foreseeable emergencies(see Emergency Response Planning Procedure <br /> S3AM-010-PR). Prior to the start of site operations, all personnel shall review Table 8-1 for site-specific information regarding <br /> evacuations, muster points, communication, and other site-specific emergency procedures. <br /> Table 4-1: Method(s) of Alerting Personnel of an Emergency <br /> ® Cell Phone © Hand Signal ❑ Radio(Channel No. ) ❑Satellite Phone <br /> ❑ Host Facility Alarm(specify): [Insert Description] [Insert Meaning] <br /> [Insert Description] _ [Insert Meaning] <br /> [Insert Description] _ [Insert Meaning] <br /> [Insert Description] _ [Insert Meaning] <br /> Table 4-2: Muster Locations and Evacuation Route(s) <br /> Muster Location Type Location Description—236 S L St Dinuba,CA <br /> Primary: AECOM Field Vehicle <br /> Alternate: • 200 S L ST D I N U BA, CA <br /> Shelter-In-Place: ♦ Field Vehicle(s) <br /> Muster Locations and Evacuation Route . . <br /> ©AECOM Restricted <br /> Universal Heath and Safety Plan Template(S4[DSC]AM-209-FM2-C) 25 <br /> Revision 15 October 18,2023 <br /> PRINTED COPIES ARE UNCONTROLLED.CONTROLLED COPY IS AVAILABLE ON COMPANY INTRANET. <br />