Laserfiche WebLink
Universal Health & Safety Plan <br /> For use on all high-risk,industrial and HAZWOPER projects <br /> Department of Toxic Substances Control <br /> • Monitoring <br /> Potential exposure to chemical hazards from sources including materials brought on site to perform work, constituents of <br /> concern found in environmental media under investigation, and/or simultaneous operations being performed at the site by the <br /> property owner/third parties are reasonably anticipated to have the potential to result in vapors,fumes, aerosols, mists, and/or <br /> airborne particulates/dusts at or near permissible exposure limits. Therefore, air monitoring that will be implemented is <br /> described below. <br /> 6.1 Real Time Exposure Measurements/Equipment <br /> Monitoring shall be performed within the work area on site to detect the presence and relative levels of toxic substances.The <br /> data collected throughout monitoring shall be used to determine the appropriate levels of PPE. Monitoring shall be conducted as <br /> specified in the work permit and THA as work is performed. All instrumentation needs to be rated intrinsically safe to prevent fire <br /> or explosion. <br /> Table 6-1: Air Monitoring Instrumentation Needed <br /> ❑X Photo Ionization Detector(PID) ■ RAE Systems mini-RAE Petroleum hydrocarbons <br /> ■ Photovac Microtip _ Organic Solvents <br /> ■ Hnu Model Hnu(min. 10.6 eV bulb) <br /> ❑ Multi or 4 Gas Detectors ■ RAE Systems Multi-RAE ■ Lower Explosive Limit <br /> ■ Oxygen <br /> ■ Carbon Monoxide <br /> ■ Hydrogen Sulfide <br /> ❑ Combustible Gas Indicator(CGI) ■ Explosivity <br /> May be combined with individual or <br /> multi-gas detectors. <br /> ❑ Particulate Monitor ■ MIE Model PDM-3 mini-RAM ■ Aerosols, mist, dust, and fumes <br /> ❑ Personal Monitoring/Badges ■ N/A ■ N/A <br /> 6.2 Monitoring Procedures <br /> The monitoring procedures shown below are general guidelines for sampling activities. In general, readings are considered <br /> actionable if sustained readings are observed for 5 minutes or more or if intermittent peaks are seen more than 1 time the action <br /> level. A reading more than action level outlined below will require additional ventilation (natural or mechanical)for 30 minutes, <br /> followed by re-monitoring. <br /> Table 6-2: Monitoring Procedures and Action Levels <br /> Parameter Zone Location and .. <br /> Monitoring <br /> ❑X Volatile Organic Breathing zone, continuously < 5 ppm ■ Continue monitoring, may continue work <br /> Compounds(VOCs) during tasks where exposure to in required PPE <br /> and Volatile VOCs and volatile hydrocarbons is 5-25 ppm ■ STOP WORK and notify PM. Investigate <br /> Hydrocarbons possible (sustained for the cause of elevated VOC measurements <br /> (total by PID) 5 minutes) and identify measures to reduce <br /> ©AECOM Restricted <br /> Universal Heath and Safety Plan Template(S4[DSC]AM-209-FM2-C) 41 <br /> Revision 15 October 18,2023 <br /> PRINTED COPIES ARE UNCONTROLLED.CONTROLLED COPY IS AVAILABLE ON COMPANY INTRANET. <br />