Laserfiche WebLink
Universal Health & Safety Plan <br /> For use on all high-risk,industrial and HAZWOPER projects <br /> Department of Toxic Substances Control <br /> 9. Site • • <br /> 9.1 Site Work Zones <br /> Site layout and site control need to be coordinated to achieve a productive work environment and efficient work process while <br /> minimizing exposure of employees and the public to hazards associated with the work. Consider the following items when <br /> planning the site layout and controls. Check the description of the site controls already in place: <br /> Table 9-1: Site Controls Already in Place <br /> ❑X Work area is within a facility/property with secure and restricted access provided by client or third party <br /> ❑ Work area is enclosed within a facility/property, but access is not restricted via locks, guards, or gates <br /> ❑ Work area is on a property that is open, but access by the public is unlikely <br /> ❑ Work area is on a property that is open and access by the public is likely <br /> ❑ Work area is in a roadway or right of way of a roadway(Traffic Control/Protection Plan required S3AM-306-PR1) <br /> ❑X Work area is in a parking lot or driveway <br /> ❑ Work area is on or near railroad, including right of way, active lines and crossings <br /> ❑ Other: NA <br /> Consider the following items when planning the site layout and controls: <br /> ■ "Line of Fire"hazards-overhead utilities,falling/tipping equipment, release of energy/pressure,flying debris <br /> ■ Noise, dust, odor suppression <br /> ■ Contamination containment and decontamination area layout <br /> ■ Traffic control for site vehicles/equipment(public traffic control requires Traffic Control Plan) <br /> ■ Restricted access for areas requiring special training, skills, or certifications <br /> ■ Restriction of work near railroads <br /> ■ Presence or creation of excavations <br /> ■ Loading/unloading areas <br /> ■ Portable restrooms <br /> ■ Dumpsters and bins <br /> ■ Equipment lay down <br /> ■ Heavy equipment parking <br /> ■ Overnight safety and security needs <br /> The following additional site controls will be implemented in work area(s)to protect the public and AECOM work team: Check <br /> and describe the site controls that need to be added to protect the public and the AECOM work team. <br /> Table 9-2: Additional Site Controls to be Implemented <br /> Control Item Description of Type and Application <br /> ❑ Fence N/A <br /> ❑ Locks N/A <br /> ❑ Barricades N/A <br /> ©AECOM Restricted <br /> Universal Heath and Safety Plan Template(S4[DSC]AM-209-FM2-C) 47 <br /> Revision 15 October 18,2023 <br /> PRINTED COPIES ARE UNCONTROLLED.CONTROLLED COPY IS AVAILABLE ON COMPANY INTRANET. <br />