Laserfiche WebLink
Universal Health & Safety Plan <br /> For use on all high-risk,industrial and HAZWOPER projects <br /> Department of Toxic Substances Control <br /> 17. ♦ Event Reporting ♦ Investigation <br /> 17.1 Incidents and Near Misses <br /> All incidents and near misses(i.e., incidents without consequences), regardless of type and perceived severity, must be <br /> reported in accordance with the Incident Reporting, Notifications and Investigation, S3AM-004-PR1 and entered into <br /> IndustrySafe(AECOM's SH&E Database)within the timeframes listed below: <br /> Table 17-1: Incident Reporting Timeframes <br /> Incident Type IndustrySafe Reporting Timeframe <br /> Significant Incident, including any injury to an AECOM employee or Subcontractor Within 4 hours <br /> All Other Incidents Within 24 Hours <br /> 17.2 Investigation <br /> All incidents and near misses will be investigated and documented to determine the contributing and root causes. The <br /> investigation will verify the need for corrective actions and identify opportunities for Lessons Learned and continuous <br /> improvement. For more information in incident investigations, please review the Incident reporting, Notifications and <br /> Investigation procedure, S3AM-004-PR1. <br /> As soon as it is safe to do so after an incident occurs,the following information will be gathered: <br /> ■ An incident timeline; ■ Police reports, if applicable; <br /> ■ Witness statements; ■ Any additional information that will assist in the investigation;and <br /> ■ Photos of the incident; ■ Copies of daily safety documentation and/or field notes. <br /> Note: Only the basic facts, who, what, when, where and how,are needed to complete the initial IndustrySafe report. SH&E Managers will <br /> assist you in updating the report as additional information becomes available. <br /> 17.3 Audits & Inspections <br /> The AECOM audit and inspection process establishes the protocol for the assessment the Safety, Health and Environment <br /> (SH&E)program and its application, as well as the process to identify and monitor corrective actions. The goal is to minimize <br /> risk and enhance operational SH&E performance. For more information on audits and inspections, please review the <br /> Compliance Assurance procedure, S3AM-216-PR1. <br /> 17.3.1 Project Manager Self-Assessment <br /> AECOM Project Managers will perform quarterly SH&E site audits using the DCSA Project Manager Self-Assessment form <br /> available in IndustrySafe. <br /> 17.3.2 Senior Management Activities (SMAs) <br /> AECOM Senior Managers will perform Senior Management Activity inspections on the projects under their area of responsibility. <br /> These SMAs will be entered into Lifeguard. <br /> ©AECOM Restricted <br /> Universal Heath and Safety Plan Template(S4[DSC]AM-209-FM2-C) 66 <br /> Revision 15 October 18,2023 <br /> PRINTED COPIES ARE UNCONTROLLED.CONTROLLED COPY IS AVAILABLE ON COMPANY INTRANET. <br />