My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SR2501523
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHARTER
>
622
>
2900 - Site Mitigation Program
>
SR2501523
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/17/2026 9:32:59 AM
Creation date
6/17/2026 9:25:33 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
SR2501523
PE
2900 - Site Mitigation Program
STREET_NUMBER
622
Direction
E
STREET_NAME
CHARTER
STREET_TYPE
WAY
City
STOCKTON
Zip
95206
APN
16715050
CURRENT_STATUS
In Review
QC Status
Approved
Scanner
SJGOV\gmartinez
Supplemental fields
Site Address
622 E CHARTER WAY STOCKTON 95206
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
475
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
AECOM <br /> Americas <br /> Daily Tailgate Meeting S3AM-209-FM5 <br /> Instructions:Conduct meeting prior to sending crews to individual tasks. Require AECOM Supervisor Name: <br /> attendance of all AECOM employees and subcontractors. Invite personnel from Phone Number: <br /> simultaneous operations for coordination purposes. Review scope of work and <br /> briefly discuss required and applicable topics.This meeting is a daily refresher, AECOM SH&E Rep. Name: <br /> not a full orientation.Task-specific discussions associated with Task Hazard Phone Number: <br /> Assessment(THA)follow this meeting at the task location immediately before Meeting Leader: <br /> individual task is started. <br /> DCS Americas-This form may be replaced by the electronic Daily Tailgate Meeting Tool.Link-Ecosystem Daily Tailgate Meeting App Site <br /> Date: Project Name/Location: Project Number: <br /> Today's Scope of Work: <br /> Muster Point Location: First Aid Kit Location: Fire Extinguisher Location: Spill Kit Location: <br /> 1. Required Topics 2. Discuss if Applicable to Today's Work <br /> ❑ Fitness for Duty requirements, all sign in/sign out J❑ ❑■ Check Q as reviewed or mark❑� as not applicable <br /> ❑ Required training (incl. task specific)completed and current ❑ ❑ Biological/Chemical/Electrical Hazards <br /> ❑SH&E Plan onsite-understood, reviewed, signed by all ❑ ❑ Ergonomics-Lifting, Body Position <br /> (incl. scope, preplanning hazard assessments/risk ❑ ❑ Lock Out/Tag Out <br /> registers, controls, procedures, requirements, etc.) ❑ ❑ Short Service Employees-visual identifier and mentor/ <br /> ❑ Task Hazard Assessments (THAs)are to be reviewed and oversight assignment <br /> completed for each task immediately prior to conducting <br /> SE] E] Simultaneous/Neighbouring Operations <br /> TOP WORK Right& Responsibility-all task <br /> changes/changed conditions re-assess with THA ❑ ❑ Slip/Trip/Fall Hazards <br /> Requirement to report to supervisor any injury, illness, ❑ Specialized PPE Needs <br /> F-] <br /> damage, near miss, unsafe act/condition ❑ ❑ Traffic Control <br /> ❑ Emergency Response Plan-including muster point, ❑ ❑ Waste Management/Decontamination <br /> first aid kit,fire extinguisher, clinic/hospital location ❑ ❑ Weather Hazards/Heat Stress/Cold Stress <br /> ❑ Personal Protective Equipment(PPE)-Required items per ❑ ❑ Subcontractor Requirements(e.g., JHAs, THAs, <br /> hazard assessments in good condition/in use by all procedures, reporting,etc.) <br /> ❑ Equipment/machinery inspected (documented as required) ❑ ❑ Work Permits/Plans required (e.g., Fall Protection, <br /> and in good condition -operators properly trained/certified <br /> ❑ Work area set up and demarcation/barricades in place to Confined Space, Hot Work, Critical Lifts, etc.); in place, <br /> protect workers,site staff, and the public understood (identify/attach): <br /> ❑ Required checklists/records available, understood (describe): <br /> ❑ ❑ Other Topics (describe/attach): <br /> Lessons Learned/SH&E improvements(describe): <br /> ❑ [I Client specific requirements (describe): <br /> 3. Daily Check Out by Site Supervisor <br /> Describe incidents, near misses, observations or Stop Work Describe Lessons Learned/ Improvement Areas from today: <br /> interventions from today: <br /> The site is being left in a safe condition and work crew checked out as fit unless otherwise specified as above. <br /> Site Supervisor Name Signature Date <br /> Time (at end of day/shift) <br /> Worker Acknowledgement/Sign In Sign Out sheets applicable to this meeting are on reverse and, if applicable, attached. <br /> Daily Tailgate Meeting(S3AM-209-FM5) <br /> Revision 10 June 1,2021 <br /> PRINTED COPIES ARE UNCONTROLLED.CONTROLLED COPY IS AVAILABLE ON COMPANY INTRANET. 1 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.