My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SR2501523
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHARTER
>
622
>
2900 - Site Mitigation Program
>
SR2501523
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/17/2026 9:32:59 AM
Creation date
6/17/2026 9:25:33 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
SR2501523
PE
2900 - Site Mitigation Program
STREET_NUMBER
622
Direction
E
STREET_NAME
CHARTER
STREET_TYPE
WAY
City
STOCKTON
Zip
95206
APN
16715050
CURRENT_STATUS
In Review
QC Status
Approved
Scanner
SJGOV\gmartinez
Supplemental fields
Site Address
622 E CHARTER WAY STOCKTON 95206
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
475
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ge ed. <br /> Imaine it. <br /> Task Hazard Assessment /'7�COM Del <br /> Oversight of Utility Clearance <br /> job/taskREMINDER: Use 4-Sight at the start of, and continuously throughout the . . . . hazards <br /> Job Steps Potential Hazards Risk Critical Actions To Mitigate Hazards Risk <br /> List all steps required to perform How could you be hurt? (initial) List control measures required to eliminate, control or protect against the (final) <br /> a task in the sequence they What would the injury be? potential hazards associated with each job step to minimize the risk of <br /> are performed injury or environmental impact. Identify any`Stop Work'triggers. <br /> • UV exposure • Always use caution when on-site and don Level D PPE minimum. <br /> • Extreme weather • Check the area for potential overhead utility/power lines and obstructions such as <br /> • Fire trees. Before moving a rig onto a location, confirm the height of the equipment with <br /> the driller/Competent Person. Make sure that the equipment is a minimum safe <br /> approach distance from power lines as outlined in AECOM's SH&E SOP S3AM-322- <br /> PR1, Overhead Lines. Use caution and wear a high-visibility reflective safety vest <br /> when working near active roads or around heavy equipment. <br /> • Observe and identify area for hazards; Ensure that pathways are clear and free of <br /> obstruction prior to initiating work; practice good housekeeping. <br /> • Assess weather conditions and begin heat and cold stress monitoring, if applicable. <br /> Apply and reapply sunscreen as necessary. <br /> • Avoid contact with insects, poisonous plants, and other animals. Conduct frequent <br /> checks for bites and other signs of insect or plant exposure. <br /> • In the case of severe weather, conditions should be monitored, and precautions <br /> taken to protect personnel. In storms, seek immediate shelter and lightning within 10 <br /> miles. Do not resume work until 30 minutes have passed since last strike. <br /> • Provide portable fire extinguishers in all field vehicles and inspect monthly. <br /> On- <br /> Site <br /> Edits: <br /> 3. Mark locations of utilities • Slips,trips, and falls 8 • Make sure you have good, solid footing and that walking/working surfaces are as 4 <br /> and other locations, as • Ergonomics clean and dry as possible. <br /> necessary • Heat/cold stress • Always use caution when on-site and don Level D PPE minimum. <br /> • Cuts/abrasions—Improper • Keep work areas free of debris. <br /> use of hand tools • Be cautious in wet and muddy conditions. Take the time to find a safe route. <br /> • Compressed gases • When possible, alternate hands to avoid repetitive use. Do not strain when collecting <br /> • UV exposure point measurements. Use arms and shoulders; do not twist your back. <br /> • Biological hazards • Stay well hydrated, taking water breaks as necessary. <br /> • Chemical exposure • Work/rest regimens shall be adjusted during hot weather. <br /> • Assess weather conditions and begin heat and cold stress monitoring, if applicable. <br /> Apply and reapply sunscreen as necessary. <br /> • Inspect equipment prior to use. Use tools for their intended use only. <br /> 2 of 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.