My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SR2501523
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHARTER
>
622
>
2900 - Site Mitigation Program
>
SR2501523
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/17/2026 9:32:59 AM
Creation date
6/17/2026 9:25:33 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
SR2501523
PE
2900 - Site Mitigation Program
STREET_NUMBER
622
Direction
E
STREET_NAME
CHARTER
STREET_TYPE
WAY
City
STOCKTON
Zip
95206
APN
16715050
CURRENT_STATUS
In Review
QC Status
Approved
Scanner
SJGOV\gmartinez
Supplemental fields
Site Address
622 E CHARTER WAY STOCKTON 95206
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
475
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
AECOM <br /> Americas <br /> Manual Lifting S3AM-014-PR1 <br /> 1.0 Purpose and Scope <br /> 1.1 This procedure provides the requirements for AECOM employees to use when performing manual materials <br /> handling activities(e.g., lifting/handling of items or materials). <br /> 1.2 This procedure applies to all staff for AECOM Americas-based operations and any other entity and <br /> its personnel contractually required to comply with this document's content. <br /> 2.0 Terms and Definitions <br /> 2.1 Manual Materials Handling (MMH)—Moving or handling things by lifting, lowering, pushing, pulling, <br /> carrying, holding, or restraining. <br /> 2.2 Team Handling—Team handling occurs when more than one person is involved during the lift. <br /> 3.0 References <br /> 3.1 None <br /> 4.0 Procedure <br /> 4.1 Roles and Responsibilities <br /> 4.1.1 Manager <br /> • Administer the procedure, provide resources as required and provide direction on proper <br /> lifting/handling techniques. <br /> • Ensure material handling activities are monitored and facilities assessed to ensure compliance <br /> with the procedure and proactively identify and correct hazardous conditions. <br /> • Ensure the proper reporting and investigations of any incidents, including those associated <br /> with manual material handling. <br /> • Ensure this procedure and any associated or applicable documents are reviewed as part of an <br /> investigation and revised as required to prevent future incidents. <br /> 4.1.2 SH&E Manager <br /> • Ensure material handling activities are monitored and facilities assessed to ensure compliance <br /> with the procedure and proactively identify and correct hazardous conditions. <br /> • Assist in identifying activities with a high potential for lifting/handling strains and injuries as well <br /> as the associated mitigation strategies. <br /> • Ensure employee training on proper lifting/manual materials handling techniques. <br /> • Assist in any investigations of incidents, including those associated with manual material <br /> handling. <br /> 4.1.3 Employees <br /> • Complete training appropriate to their anticipated manual material handling tasks. <br /> • Review and follow any additional procedures or instructions applicable to the task at hand. <br /> 4.2 Mechanical/Engineered Controls <br /> 4.2.1 Whenever possible, new operations should be evaluated to engineer out hazards before work <br /> processes are implemented. <br /> Manual Lifting(S3AM-014-PR1) <br /> Revision 2 July 31,2019 <br /> PRINTED COPIES ARE UNCONTROLLED. CONTROLLED COPY IS AVAILABLE ON COMPANY INTRANET. Page 1 of 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.