Laserfiche WebLink
lrnag�ne it. <br /> Figure 1. Depiction ufTraveled Way, Rnadway, Shoulder, Clear Zone <br /> Roadway <br /> Shoulder Traveled Way Shoulder— <br /> Clear Zone Clear Zone <br /> ~--------1 /--------^ <br /> 6. References <br /> List other procedures or external standards/regulations that apply to carrying out the process in this document. List <br /> using 'Alpha Lisfoption from the AECOM Procedure List dropdown on the Home tab. <br /> u. S3AK4'OU3'PR1SH&ETraining <br /> b. S3AK4'2U8'PR1Personal Protective Equipment <br /> C. S3AK4'2U0'PR1Risk Assessment&Management <br /> d. S3AK4'2U2'PR1Competent Person Designation <br /> e. S3AK4'O08'PR1Fitness for Duty <br /> [ S3AK4'OU8'PR1Emergency Response Planning—Americas <br /> 7. Records <br /> Traffic Protection Plans,Traffic Control P|ana, and completed Equipment Checklists shall be maintained in project <br /> files. <br /> 8. Appendices <br /> a. S3AM-306-FM1 Equipment Checklist <br /> — <br /> S3AM-306-ATT1 Protective Devices for Temporary Traffic Control (TCC) <br /> C. S3AM-306-ATT2 Short and Long Term Work Zones <br /> d. S3AM-306-ATT3 Safe Work Practices for RoadwaV Workers <br /> e. S3AM-306-ATT4 Safe Work Practices for Night Operations in Work Zones <br /> [ S4[DCSIAM-306-ATT1 Subcontracting Temporary Traffic Control–DCSA Group <br /> 9' Change Log <br /> List the change history pertaining to this document including if it was identified differently throughout its life-cycle: <br /> Rav# Change Description of Change Location of Change <br /> Date <br /> 2 Mar 1. 2O10 AECOM URS integration oflegacy documents <br /> 3 Dec 15. 2016 See Level III Americas Revision Summary December 15, Various locations <br /> 2016 <br /> @ AEooMnostnoteu <br /> Highway and Road wmm(uoAm-3oopn1} <br /> Revision oApril uu.xouo <br /> PRINTED COPIES ARE UNCONTROLLED. CONTROLLED COPY mAVAILABLE omCOMPANY INTRANET. nu <br />