My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SR2501523
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHARTER
>
622
>
2900 - Site Mitigation Program
>
SR2501523
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/17/2026 9:32:59 AM
Creation date
6/17/2026 9:25:33 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
SR2501523
PE
2900 - Site Mitigation Program
STREET_NUMBER
622
Direction
E
STREET_NAME
CHARTER
STREET_TYPE
WAY
City
STOCKTON
Zip
95206
APN
16715050
CURRENT_STATUS
In Review
QC Status
Approved
Scanner
SJGOV\gmartinez
Supplemental fields
Site Address
622 E CHARTER WAY STOCKTON 95206
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
475
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
AECOM <br /> Americas <br /> Heavy Equipment S3AM-309-PR1 <br /> 1.0 Purpose and Scope <br /> 1.1 Outline the safe working requirements for working with and near heavy equipment and heavy equipment <br /> operation. <br /> 1.2 Military related vehicles and equipment(e.g.tanks)are not covered under this standard. <br /> 1.3 This procedure applies to all AECOM Americas-based employees and operations and any other entity and <br /> its personnel contractually required to comply with this document's content. <br /> 2.0 Terms and Definitions <br /> 2.1 Heavy equipment—All excavating equipment(e.g. scrapers, loaders, crawler or wheel tractors, excavators, <br /> backhoes, bulldozers, graders, agricultural and industrial tractors, etc.), cranes, lift trucks, drills, etc. This <br /> may include off-highway trucks(e.g. dump truck, heavy haul truck, etc.). For requirements related to crew <br /> trucks refer to S3AM-005-PRI Driving. <br /> 2.2 Operator—Any person who operates the controls while the heavy equipment is in motion or the engine is <br /> running. <br /> 2.3 Ground personnel/workers—Personnel performing work on the ground around heavy equipment(note: <br /> operators are considered ground personnel when outside of the equipment cab). <br /> 3.0 References <br /> 3.1 S3AM-005-PR1 Driving <br /> 3.2 S3AM-202-PR1 Competent Person Designation <br /> 3.3 S3AM-213-PR1 Subcontractor Management <br /> 3.4 S3AM-303-PR1 Excavation <br /> 3.5 S3AM-322-PR1 Overhead Lines <br /> 3.6 S3AM-325-PR1 Lockout Tagout <br /> 3.7 S3AM-331-PR1 Underground Utilities&Subsurface Installation Clearance <br /> 4.0 Procedure <br /> 4.1 Roles and Responsibilities <br /> 4.1.1 Managers/Supervisors <br /> • Responsible for confirming all equipment is in good working order and all equipment operators <br /> are verified as qualified on the piece of machinery they are assigned. <br /> • As applicable, review as-built drawings. <br /> • Maintain operation manuals at the site for each piece of equipment that is present on the site <br /> and in use. <br /> • Maintain a list of operators for the project, and the specific equipment that they are authorized <br /> to operate. <br /> • Prohibit equipment from being operated by any personnel who have not been specifically <br /> authorized to operate it. <br /> Heavy Equipment(S3AM-309-PR1) <br /> Revision 6 July 31,2019 <br /> PRINTED COPIES ARE UNCONTROLLED. CONTROLLED COPY IS AVAILABLE ON COMPANY INTRANET. Page 1 of 12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.