My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SR2501523
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHARTER
>
622
>
2900 - Site Mitigation Program
>
SR2501523
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/17/2026 9:32:59 AM
Creation date
6/17/2026 9:25:33 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
SR2501523
PE
2900 - Site Mitigation Program
STREET_NUMBER
622
Direction
E
STREET_NAME
CHARTER
STREET_TYPE
WAY
City
STOCKTON
Zip
95206
APN
16715050
CURRENT_STATUS
In Review
QC Status
Approved
Scanner
SJGOV\gmartinez
Supplemental fields
Site Address
622 E CHARTER WAY STOCKTON 95206
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
475
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
AECOM <br /> 4.10.1 In addition to any minimum requirements the drilling subcontractor may have, prior to set up, <br /> adequate site clearing and leveling shall be performed to accommodate the rig and supplies and <br /> provide a safe working area. <br /> 4.10.2 Clearing the site includes clearing the intended drilling area obstacles and of underground utilities <br /> in accordance with S3AM-331-PRI Underground Utilities. <br /> 4.10.3 Drilling or probing shall not commence when tree limbs, unstable ground, or site obstructions cause <br /> unsafe tool handling conditions. <br /> • The cleared/levelled area should be large enough to accommodate the rig and supplies. <br /> • If the rig is positioned on a steep grade and levelling of the ground is impossible or impractical, <br /> the wheel of the transport vehicle shall be blocked and other means employed of preventing <br /> the rig from moving or toppling over. <br /> 4.11 Drilling Activities <br /> 4.11.1 Federal/State/Provincial/Territorial regulations that govern drill rig operations and exposed <br /> moving parts shall be adhered to. <br /> 4.11.2 All applicable client on-site safety procedures shall be understood and adhered to. <br /> 4.11.3 Minimum approach distances(MAD)from subsurface and overhead utilities and subsurface <br /> installations will be established including 5 feet(1.5 meters)from any subsurface utility, 7 feet(2.1 <br /> meters)from the pad surrounding any underground storage tanks, and 10 feet(3 meters)from any <br /> overhead energized electrical line(or further depending on line voltage). These approach distances <br /> are a minimum; government regulations and utility requirements may dictate a greater set back <br /> distance and should be confirmed. <br /> 4.11.4 Verify that equipment/energy is isolated when lockout is required: <br /> • Refer to operator's manual and S3AM-325-PRI Lockout Tagout. <br /> • Ensure stop switch is activated. <br /> • Driller is out of the seat. <br /> • Test controls to ensure they do not engage. <br /> 4.11.5 In addition to any identified minimum requirements(as applicable, client, drilling subcontractor), the <br /> following safety measures shall be taken during drilling, boring or probing operations on site: <br /> • The operator and helper shall be present during all active rig operations. <br /> • Site personnel shall remain within visual contact of the rig operator. <br /> • Hard hats, approved safety boots, safety glasses, and hearing protection shall be worn in the <br /> work zone(minimum,the radius around the rig equal to the height of the drill rig mast)of a rig. <br /> • Gas monitoring shall be conducted as appropriate. <br /> • Hands,feet and other body parts shall be kept away from moving parts, (e.g. hoisted, rotating, <br /> pushing, etc.) including augers, drill rods and reamers. <br /> • When observing drilling, stand upwind of the drill rig to prevent potential exposure to vapors <br /> that may be emitted from the borehole. <br /> • The emergency shut-off switch on the rig shall be identified to site personnel and tested on a <br /> daily basis by the operator. <br /> • Unauthorized personnel shall be kept outside of the established work zone. <br /> • Rig crew and other worksite personnel shall not use a cell phone while operating the drill rig or <br /> other equipment or within the rig work zone. <br /> • Do not drive the rig from hole to hole with the mast(derrick)in the raised position. <br /> • Before raising the mast(derrick)look up to check for overhead obstructions. Refer to S3AM- <br /> 322-PR1 Overhead Lines. <br /> Drilling,Boring,&Direct Push Probing(S3AM-321-PR1) <br /> Revision 2 July 31,2019 <br /> PRINTED COPIES ARE UNCONTROLLED. CONTROLLED COPY IS AVAILABLE ON COMPANY INTRANET. Page 6 of 12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.