Laserfiche WebLink
Universal Health & Safety Plan <br /> For use on all high-risk,industrial and HAZWOPER projects <br /> Department of Toxic Substances Control <br /> Attachment D: Site Safety Orientation <br /> AECOM will conduct a site safety briefing for a person's initial visit to the site. The briefing will be conducted: <br /> ■ Prior to the start of work; <br /> ■ For any new AECOM or subconsultant personnel; <br /> ■ For Site Visitors; and <br /> ■ At each mobilization, or whenever there is a change in task or significant change in task location. <br /> All personnel working on the project who have received the site briefing(including the SWP review)will sign the Personal <br /> Acknowledgement located in Section 20.Visitors may receive a shortened version to address the hazards specific to their visit. <br /> The following topics, at minimum, will be discussed during the site safety briefing: <br /> ■ Contents of this SWP; <br /> ■ The Emergency Response Plan (Section 4); <br /> ■ Contractor SHE Management expectations; <br /> ■ Injury management, including notification and hospital and occupational clinic locations; <br /> ■ The AECOM 4-Sight program; <br /> ■ Stop Work authority; <br /> ■ The THAs(Attachment A)for the activities that will be performed on a given job; <br /> ■ Types of hazards at the site and means for minimizing exposure to them; <br /> ■ Instructions for new operations to be conducted, and safe work practices; <br /> ■ PPE that must be used; <br /> ■ Lone worker check-in procedures; <br /> ■ Emergency evacuation routes, muster points, and tornado/storm shelters; and <br /> ■ Location and use of emergency equipment. <br /> ■ These briefings must be documented and maintained in the project files. <br /> ©AECOM Restricted <br /> Universal Heath and Safety Plan Template(S4[DSC]AM-209-FM2-C) <br /> Revision 15 October 18,2023 <br /> PRINTED COPIES ARE UNCONTROLLED.CONTROLLED COPY IS AVAILABLE ON COMPANY INTRANET. <br />