Laserfiche WebLink
A4OM <br /> 7 SAMPLING PROCEDURES SOIL VAPOR PROBES 5 AND 15 FEET <br /> 7.1 SAMPLE TRAIN SET UP <br /> FIGURE 1 SAMPLE TRAIN <br /> HELIWA TANI4 <br /> TRACER CAS <br /> C.D. TYG6eTuaiNc, <br /> r i VENT - — <br /> I_= ORATORY CANISTER <br /> YAl-VE $2 <br /> VALVE #1 <br /> --' 1/4' O.p. STAINLESS <br /> 1/4" 0. 7T-'I`,LE55 STEEL TWENIi <br /> STEEL T,il:?�G +f <br /> XId <br /> 1 � <br /> BASEMENT FLDOR <br /> (TFQCKNE55 YAF{IE5). <br /> MODELI#¢G �4 CLAY .a ' { a . " • � IRATORY <br /> r. d r' FLOW <br /> LEGEND CONTROLLER* <br /> .. <br /> r i ; .: 4 ❑ EQUIPMENT FROM RATC RY <br /> d - Y ❑ REUSABLE AND DECOKI'AMINATED ST►1R+LESS STEEL <br /> FrMNGS[E.G.-SWAGELOKOOR E-00VAEEiS�1 <br /> a * i .t .. .' ❑ SINGLE USE EOUIPNIENr <br /> r * �.• CDh+CRETESLA13 <br /> MODELJNG CLAY <br /> * 1W LD.TO I FT II}.FORT CONNECTOR <br /> TW LD-T-CONNECTOR <br /> ., TW LD-BARB CONNECTOR <br /> lAr Q.D.STAINLESS STEEL TUBI N <br /> —I TfB"DIAMETER HOLE <br /> 511I1'DL METER HOLE <br /> TEnsAG-r-LFTM <br /> PERI STALTFC PLIW LCCAT10N <br /> 1W LD.BALL VALVE <br /> I WEr I-D.TO 1 A'1.0-FZEDUEER <br /> 1W I-D.ELBOW GCN•1FIEGTOR <br /> SUBGRAgE <br /> 7.2 PROBE INSTALLATION <br /> Remove the temporary modeling clay and install the probe in the hole,with the sampling train configuration already attached. <br />