Laserfiche WebLink
Universal Health & Safety Plan <br /> For use on all high-risk,industrial and HAZWOPER projects <br /> Department of Toxic Substances Control <br /> Contractual • for • the Environment <br /> ❑X I have reviewed the AECOM Contract with our client and described our contractual duties for SH&E Below. <br /> Wanda Farmer "" -A• : QaANy� April 5, 2024 <br /> Project Manager Name Project Manager Signature Date <br /> ❑X AECOM is responsible for our own safety and that of our subcontractors. <br /> ❑ AECOM will be on-site with a General Contractor or other party who is responsible for their own safety.AECOM must comply with their safety plan in addition to <br /> our own plan; AECOM remains responsible for our safety and that of our subcontractors. <br /> ❑ AECOM has some level of safety responsibility for a General Contractor or other party(includes responsibility for reporting safety hazards, reviewing site controls <br /> etc.; describe below). <br /> ❑ Other/Additional Details: N/A <br /> ©AECOM Restricted <br /> Universal Heath and Safety Plan Template(S4[DSC]AM-209-FM2-C) 5 <br /> Revision 15 October 18,2023 <br /> PRINTED COPIES ARE UNCONTROLLED.CONTROLLED COPY IS AVAILABLE ON COMPANY INTRANET. <br />