Laserfiche WebLink
Universal Health & Safety Plan <br /> For use on all high-risk,industrial and HAZWOPER projects <br /> Department of Toxic Substances Control <br /> 4. Emergency Response Plan <br /> AECOM requires that all projects, plan for reasonably foreseeable emergencies. Prior to the start of site mobilization, all <br /> AECOM personnel shall review the site-specific information regarding evacuations, muster points, communication, emergency <br /> equipment and its location, and other site-specific emergency procedures. <br /> Subcontractors will not use AECOM Hotline#and may use a different clinic based on their own Emergency Protocols. They will <br /> provide their own Project Emergency Plan to AECOM for review and acceptance. Any alterations to this plan must be <br /> communicated to all parties. Both AECOM and the subcontractor shall perform mock drills periodically in accordance with the <br /> length of the project. <br /> 4.1 Directions and Maps to Nearest Medical Treatment Resources <br /> See following pages for directions and maps. <br /> ©AECOM Restricted <br /> Universal Heath and Safety Plan Template(S4[DSC]AM-209-FM2-C) 10 <br /> Revision 15 October 18,2023 <br /> PRINTED COPIES ARE UNCONTROLLED.CONTROLLED COPY IS AVAILABLE ON COMPANY INTRANET. <br />