Laserfiche WebLink
0 <br /> S ECOR <br /> Logged By: Date Drilled: Drilling Contractor Project Name: Method/Equipment: well Number: <br /> STTC-Ozone Well Install Air Rotary <br /> C.M. 10/17/03 Cascade Drilling Stockton,California Casing Hammer OS-15B <br /> Boring Surface Groundwater Depth(ft.): Total Drive Drop <br /> Diam.(in.): Elev.(ft.): SZ 12.5 First Water Depth(ft.): wt.(Ibs.): Dist.(in.): <br /> 8 37.0 140 30 <br /> 0 <br /> Well r U a <br /> Description <br /> Construction o q <br /> a <br /> 187 <br /> SILTY SAND(SM):dark greenish gray(10G 3/1),fine grained sand,medium dense, <br /> wet,moderate hydrocarbon odor,(0,60,40). <br /> 326 <br /> p: a: <br /> --------------------------------------- <br /> 30 POORLY GRADED SAND WITH SILT(SP-SM):dark greenish gray(LOGY 3/I), <br /> Bentonite fine grained sand,medium dense,wet,moderate to strong hydrocarbon odor,(0,90,10). <br /> #3 Sand <br /> A. 2„Sparge <br /> Tip <br /> 35 As above,increased grain size to fine-medium grained. <br /> 40 <br /> 45 <br /> The substrata descriptions above are generalized representations and based upon visual/manual classification of cuttings and/or <br /> samples obtained during drilling. Predominant material types shown on the log may contain different materials and the change from <br /> one predominant material type to another could be different than indicated. Descriptions on this log apply only at the specific location <br /> at the time of drilling and may not be representative of subsurface conditions at other locations or times. <br /> Project No. 77OT.43673.06.0007 Date 11/19/04 Log of Well <br /> OS iB-16B.GP] Figure <br /> LOG OF BOREHOLE <br /> (sheet 2 of 2) <br />