My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WASHINGTON
>
2201
>
2900 - Site Mitigation Program
>
PR0544282
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/23/2026 11:06:17 AM
Creation date
6/23/2026 9:01:11 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0544282
PE
2965 - RWQCB LEAD AGENCY WASTE DISCHARGE SITE
FACILITY_ID
FA0025168
FACILITY_NAME
ROUGH AND READY ISLAND, PORT OF STOCKTON
STREET_NUMBER
2201
STREET_NAME
WASHINGTON
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
16203007
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\gmartinez
Supplemental fields
Site Address
2201 WASHINGTON ST STOCKTON 95203
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
293
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1. INTRODUCTION <br /> 1.1 Overview <br /> This Standard Operating Procedure(SOP)provides details on the direct push technology <br /> (DPT) drilling for grab groundwater sampling methodology. The soil boring and <br /> groundwater sampling SOP was prepared to direct field personnel in the methods for <br /> recording soil boring observations,collecting subsurface soil samples,and collecting grab <br /> groundwater samples during Site investigations. The SOP conforms to the California <br /> Department of Water Resources (DWR) Water Well Standards Bulletin Numbers 74-81 <br /> and 74-90 (DWR, 1990), United States Environmental Protection Agency (USEPA) <br /> Groundwater Sampling and Monitoring with Direct Push Technologies (USEPA, 2005) <br /> and other pertinent technical publications. Field forms to be used during Site <br /> investigations are provided in attachments. <br /> Included in this SOP are the procedures, equipment needs, field documentation forms, <br /> project planning, and field implementation steps for specific field tasks. Overall, the <br /> SOPS listed below provide general methods and procedures that may be changed due to <br /> variations in field conditions. Such changes will be approved by the project manager and <br /> Port prior to implementation in the field. <br />
The URL can be used to link to this page
Your browser does not support the video tag.