Laserfiche WebLink
s <br /> Port of Stockton - 2 - 25 June 2018 <br /> RTCs and Final Groundwater Monitoring Work Plan <br /> on the draft work plan and concur with the Port of Stockton's request to begin phase 1 of the <br /> Final Work Plan on 25 June 2018 Please note that the outstanding issues raised by DTSC will <br /> need to be addressed in both the media-specific evaluation of COCs and future work plans and <br /> reports. <br /> If you have any questions about this letter, please feel free to contact me by email at <br /> John.murphy(a)waterboards.ca.gov or by phone at (315) 276-8080. <br /> Sincerely. :,S\pNAL cF0`o <br /> JOHN T CU, <br /> MURPHY JR. -� <br /> John T. Murphy, PG #9524 <br /> Engineering Geologist Na 9524 <br /> DoD & Site Cleanup Program s��r <br /> F OF CM_0 <br /> cc Mr. Steven W. Escobar <br /> Deputy Port Director <br /> Port of Stockton <br /> Real Estate & Port Development <br /> P.O. Box 2089 <br /> Stockton, California 95201 <br /> sescobar(a-)stockton port.com <br /> Mr. Jason Cashman <br /> Environmental Manager <br /> Port of Stockton <br /> P.O Box 2089 <br /> Stockton, California 95201 <br /> jcashman(Dstocktonport.com <br /> Lance K. McMahan, CE <br /> Brownfields and Environmental Restoration Program <br /> Department of Toxic Substances Control <br /> 8800 Cal Center Drive <br /> Sacramento, CA 95826-3200 <br /> Lance.McMahan(LDdtsc.co.gov <br /> cc: electronic submittal <br /> Ms. Anju Wicke, Geosyntech <br /> Ms Nicole Gotberg, Geosyntech <br />