My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WASHINGTON
>
2201
>
2900 - Site Mitigation Program
>
PR0544282
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/23/2026 11:06:17 AM
Creation date
6/23/2026 9:01:11 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0544282
PE
2965 - RWQCB LEAD AGENCY WASTE DISCHARGE SITE
FACILITY_ID
FA0025168
FACILITY_NAME
ROUGH AND READY ISLAND, PORT OF STOCKTON
STREET_NUMBER
2201
STREET_NAME
WASHINGTON
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
16203007
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\gmartinez
Supplemental fields
Site Address
2201 WASHINGTON ST STOCKTON 95203
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
293
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Geosyntec t> <br /> consultants <br /> LIST OF TABLES <br /> Table 1: Description of RRI Groundwater Sites (Section 1.2) <br /> Table 2: Hydraulic Conductivity Ranges at RRI (Section 2.3.4.1) <br /> Table 3: Most Recent cis-1,2-DCE and VC Concentrations <br /> Table 4: September to December 2015 Groundwater Elevations <br /> Table 5: MAROS Results Summary <br /> Table 6: MAROS Results for Individual Wells <br /> Table 7: Groundwater Monitoring Plan <br /> Table 8: Surface Water Monitoring Plan <br /> Table 9: Grab-Groundwater Sampling Plan <br /> LIST OF FIGURES <br /> Figure 1: Site Location Map <br /> Figure 2: Site Overview <br /> Figure 3: Island-wide Groundwater Plume Distribution <br /> Figure 4: Sacramento-San Joaquin Delta Map <br /> Figure 5: USGS Sacramento-San Joaquin Delta Islands Conceptual Site <br /> Model <br /> Figure 6: RRI Hydrogeologic Conceptual Site Model <br /> Figure 7: Drainage Channel System Map <br /> Figure 8: USGS San Joaquin River Stream Gage Surface Water Elevations <br /> Figure 9: Site 3 Groundwater and Surface Water Drainage Channel <br /> Geochemistry <br /> Figure 10: Hydrographs of Monitoring Wells Compared to Surface Water <br /> Elevations <br /> Figure 11: Cis-1,2-DCE Distribution in Groundwater <br /> Figure 12: Vinyl Chloride Distribution in Groundwater <br /> Figure 13: Site 3—Cis-1,2-Dichloroethene Distribution in Groundwater <br /> Figure 14: Site 3—Vinyl Chloride Distribution in Groundwater <br /> RRI Groundwater Monitoring Work Plan iv I June 2018 <br />
The URL can be used to link to this page
Your browser does not support the video tag.