Laserfiche WebLink
Geosyntec t> <br /> consultants <br /> LIST OF TABLES <br /> Table 1: Description of RRI Groundwater Sites (Section 1.2) <br /> Table 2: Hydraulic Conductivity Ranges at RRI (Section 2.3.4.1) <br /> Table 3: Most Recent cis-1,2-DCE and VC Concentrations <br /> Table 4: September to December 2015 Groundwater Elevations <br /> Table 5: MAROS Results Summary <br /> Table 6: MAROS Results for Individual Wells <br /> Table 7: Groundwater Monitoring Plan <br /> Table 8: Surface Water Monitoring Plan <br /> Table 9: Grab-Groundwater Sampling Plan <br /> LIST OF FIGURES <br /> Figure 1: Site Location Map <br /> Figure 2: Site Overview <br /> Figure 3: Island-wide Groundwater Plume Distribution <br /> Figure 4: Sacramento-San Joaquin Delta Map <br /> Figure 5: USGS Sacramento-San Joaquin Delta Islands Conceptual Site <br /> Model <br /> Figure 6: RRI Hydrogeologic Conceptual Site Model <br /> Figure 7: Drainage Channel System Map <br /> Figure 8: USGS San Joaquin River Stream Gage Surface Water Elevations <br /> Figure 9: Site 3 Groundwater and Surface Water Drainage Channel <br /> Geochemistry <br /> Figure 10: Hydrographs of Monitoring Wells Compared to Surface Water <br /> Elevations <br /> Figure 11: Cis-1,2-DCE Distribution in Groundwater <br /> Figure 12: Vinyl Chloride Distribution in Groundwater <br /> Figure 13: Site 3—Cis-1,2-Dichloroethene Distribution in Groundwater <br /> Figure 14: Site 3—Vinyl Chloride Distribution in Groundwater <br /> RRI Groundwater Monitoring Work Plan iv I June 2018 <br />