My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WASHINGTON
>
2560
>
2900 - Site Mitigation Program
>
PR0548313
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/23/2026 2:41:20 PM
Creation date
6/23/2026 2:19:12 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0548313
PE
2960 - RWQCB LEAD AGENCY CLEAN UP SITE
FACILITY_ID
FA0027581
FACILITY_NAME
TESORO STOCKTON TERMINAL
STREET_NUMBER
2560
Direction
W
STREET_NAME
WASHINGTON
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
14503012
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\gmartinez
Supplemental fields
Site Address
2560 W WASHINGTON ST STOCKTON 95203
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
99
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
7. LOQ: The laboratory shall demonstrate precision and bias at the LOQ for each analyte-matrix-method, <br /> including surrogates. The LOQ and associated precision and bias must meet client requirements and be <br /> available to be reported. <br /> 8. The LOQ shall be verified quarterly. LOQ verifications shall include routine cleanup steps, for methods <br /> where those cleanups might sometimes be employed. <br /> 9. If LOQ verification results are not consistent with initial precision and bias characterization, the precision <br /> and bias performance characteristics at the LOQ shall be recalculated. Clients with projects utilizing the lab's <br /> LOQ precision and bias values shall be notified of the change. <br /> 4r <br /> 9.3) Appendix 3 — MDL Flowcharts <br /> Initial MOL Determination <br /> I <br /> Preps re minimum of7 spikes at Each batch containing If no previous blank data. prepare If not a new method, <br /> 2-1 d times estimated MDL• replicate spikes and a minimum of 7 method blanks, use existing data up <br /> in 3 batches, method blank. in 3 batches. to 24 months earlier. <br /> on 3 different days Can use existing data un 3 different days <br /> from last 24 months. <br /> Analyze on 3 different days. Analyze an 3 different days. <br /> Fix problem and If multiple instruments, at least on meepleinst ixtract nstruments <br /> entsbe If multiple instruments• at least If not a repeat or spike ata 2s spikes analyzed on different as <br /> slongiasmintruments useexningdatew up <br /> P kf 2 blanks analyzed an different <br /> higher level calendar days each aslong as minimums to 24 months <br /> data up <br /> y satisfied. calendar days an each instrument ta24monthsearlier. <br /> instrument <br /> + I \ <br /> All results meet At leastsome <br /> _ Stop. <br /> qualitative I❑ Clanks produce �� f•113Lb does <br /> 4 criteria? numericresults? not apply, <br /> o-nly Mf?L <br /> will be used <br /> Calculate MDL from blanks. 99th percentile used <br /> Calculate MDL from spikes. MDLb_Avg +f x 5b if not all blanks <br /> IODL.=f x S� produce a numeric <br /> ` or990hperrentiie <br /> �,lDLs }MDLb? <br /> Ye= _ <br /> V <br /> Final MDL= WDLs Final h1DL= MDLb <br />
The URL can be used to link to this page
Your browser does not support the video tag.