Laserfiche WebLink
S JCOG, Inc. <br /> 555 East Weber Avenue • Stockton,CA 95202 • (209)235-0574•Email: boyd®sjcog.org <br /> San Joaquin Counhj Multi-Species Habitat Conservation&Open Space Plan (SJMSCP) <br /> I I U,hoorl.." <br /> -0i SJMSCP RESPONSE TO LOCAL JURISDICTION(RTLJ) <br /> ADVISORY AGENCY NOTICE TO SJCOG,Inc. <br /> To: Jessica Leal,San Joaquin County,Community Development Department <br /> From: Laurel Boyd, SJCOG, Inc. Phone: (209)235-0574 Email: boyd@sjcog.org <br /> Date: June 25, 2026 <br /> Local Jurisdiction Project Title: PA-2600098(RA),PA-2300159(A) <br /> Assessor Parcel Number(s): 193-020-62 <br /> Local Jurisdiction Project Number: PA-2600098(RA),PA-2300159(A) <br /> Total Acres to be converted from Open Space Use: Unknown <br /> Habitat Types to be Disturbed: Natural Habitat Land <br /> Species Impact Findings: Findings to be determined by SJMSCP biologist. <br /> Dear Ms. Leal: <br /> SJCOG, Inc. has reviewed the project referral for PA-2600098 (RA), PA-2300159 (A). This project consists of a Revision of <br /> Approved Action application for No.PA-2300159 Conditions of Approval. The conditions to be modified are the following: <br /> • Planning Condition 1.j.1 to allow for screening using chain link fence and dense landscaping along property lines where truck or <br /> trailer parking is located. <br /> • Public Works Condition No.2.d.regarding frontage improvements for French Camp Road. <br /> The proposed operation will utilize onsite well and septic systems, and an onsite retention pond is proposed for storm water drainage. <br /> The project site is on the east side of South French Camp Road,800 feet north of South El Dorado Street,French Camp(APN/Address: <br /> 193-020-62/6130 S.French Camp Road,French Camp). <br /> San Joaquin County is a signatory to San Joaquin County Multi-Species Habitat Conservation and Open Space Plan <br /> (SJMSCP). Participation in the SJMSCP satisfies requirements of both the state and federal endangered species acts, <br /> and ensures that the impacts are mitigated below a level of significance in compliance with the California Environmental <br /> Quality Act (CEQA). The LOCAL JURISDICTION retains responsibility for ensuring that the appropriate Incidental Take <br /> Minimization Measure are properly implemented and monitored and that appropriate fees are paid in compliance with the <br /> SJMSCP. Although participation in the SJMSCP is voluntary, Local Jurisdiction/Lead Agencies should be aware that if <br /> project applicants choose against participating in the SJMSCP, they will be required to provide alternative mitigation in an <br /> amount and kind equal to that provided in the SJMSCP. <br /> This Project is subject to the SJMSCP. This can be up to a 30 day process and it is recommended that the project <br /> applicant contact SJMSCP staff as early as possible. It is also recommended that the project applicant obtain an <br /> information package. http://www.sjcog.Drg <br /> Please contact SJMSCP staff regarding completing the following steps to satisfy SJMSCP requirements: <br /> ■ Schedule a SJMSCP Biologist to perform a pre-construction survey prior to any ground disturbance <br /> • SJMSCP Incidental take Minimization Measures and mitigation requirement: <br /> 1. Incidental Take Minimization Measures(ITMMs)will be issued to the project and must be signed by the project applicant prior to any <br /> ground disturbance but no later than six(6)months from receipt of the ITMMs. If ITMMs are not signed within six months,the applicant <br /> must reapply for SJMSCP Coverage. Upon receipt of signed ITMMs from project applicant,SJCOG,Inc.staff will sign the ITMMs. This <br /> is the effective date of the ITMMs. <br /> 2. Under no circumstance shall ground disturbance occur without compliance and satisfaction of the ITMMs. <br /> 3. Upon issuance of fidly executed ITMMs and prior to any ground disturbance,the project applicant must: <br /> a. Post a bond for payment of the applicable SJMSCP fee covering the entirety of the project acreage being covered(the bond <br /> should be valid for no longer than a 6 month period);or <br /> b. Pay the appropriate SJMSCP fee for the entirety ofthe project acreage being covered;or <br />