Laserfiche WebLink
SAN aOAQUIN Environmental Health Department <br /> COUNTY— <br /> Greatness grows here. <br /> CP26 - UST FULL Inspection Report <br /> Facility Name: Facility Address: Date: <br /> MY MINI MART 11756 N WILSON WAY STOCKTON June 1 2026 <br /> 5 23 CCR 16 2613(a)(6) and (b), 2650(a), (d), and (e) 2011013 - Facility has submitted a complete and accurate UST <br /> Response Plan <br /> OBSERVATION: Owner/Operator failed to submit a complete and accurate UST Response Plan. The UST Response <br /> Plan submitted in CERS lists the responsible person as Mansoorullah Kamal but no emergency contact information is <br /> listed for Manoorullah Kamal. The contact phone numbers listed are for the business and for Hakimi and Amir, who are <br /> listed as "partners". Hakimi and Amir are not listed as one of the persons responsible for authorizing any work necessary <br /> under the response plan. <br /> REGULATION GUIDANCE: § 2650(d) Response Plan—Owners or operators must submit a response plan to the Unified <br /> Program Agency which demonstrates, to the satisfaction of the Unified Program Agency, that any unauthorized release <br /> will be removed from the secondary containment as soon as practical. This must be within a time consistent with the <br /> ability of the secondary containment to contain the hazardous substance but must not exceed 30 days. The response <br /> plan must include, but is not limited to, the following: (3)The name(s), title(s) and emergency contact information of the <br /> person(s) responsible for authorizing any work necessary under the response plan or, if applicable, identify that there is a <br /> continuously staffed emergency operations center authorized to coordinate such a response and provide a 24-hour <br /> phone number for that center. <br /> CORRECTIVE ACTION: Submit a complete and accurate UST Response Plan into CERS and maintain a current copy <br /> on site. <br /> This is a (Minor)Violation. <br /> 7 23 CCR 16 2613(a)(8) and (b), 2630(b) 2011004-Owner/Operator submitted DO form within 30 days of UST install or <br /> DO change (TCR 10) <br /> OBSERVATION: A new designated operator, Kaleb Winkler, began conducting inspections on 2/5/2026 and notification <br /> was not provided to the EHD within 30 days of the change. <br /> REGULATION GUIDANCE: § 2613(a)(8), § 2613(b), § 2630(b)Within 30 days of any change to the designated <br /> underground storage tank operator(s), the owner or operator must submit to the Unified Program Agency information <br /> identifying the designated underground storage tank operator(s)for the facility. The name of each designated <br /> underground storage tank operator listed in the California Environmental Reporting System must be identical to that <br /> individual's name as listed on the individual's International Code Council UST System Operator certificate. <br /> CORRECTIVE ACTION: Immediately log into the California Environmental Reporting System (CERS) at <br /> http://cers.calepa.ca.gov and upload the notification identifying all the designated operators for this facility. <br /> This is a (Minor)Violation. <br /> 40 23 CCR 16 2613(e) 2011002 - Installation, repair, lining, integrity, calibration, and release records maintained for life of <br /> UST <br /> OBSERVATION: Records of installation, repairs, linings, intregrity certification and/or unauthorized release reports were <br /> not kept onsite, or offsite if approved by the UPA, for the life of the UST. Installation records were not observed on site. <br /> Tank calibration charts were found on site. <br /> REGULATION GUIDANCE: § 2613(e)The following records must be maintained by the owner or operator on site, or off <br /> site at a readily accessible location if approved by the Unified Program Agency, for the life of the underground storage <br /> tank system: (1) Installation records including, but not limited to: (A)Installation test results; (B)Manufacturer checklists <br /> and manuals; and (C)As-built drawings. (2) Records of repairs, including inspection reports and structural integrity <br /> certifications associated with interior lining; (3)Tank calibration charts; and (4) Unauthorized release reports. <br /> CORRECTIVE ACTION: Immediately locate and maintain these records onsite and submit copies to the UPA within 30 <br /> days. <br /> This is a (Minor)Violation. <br /> EHD-CUPA Inspection Report IS03 Page 5 of 6 FA0001858 PR0231300 4655062 6/1/2026 <br /> CP26-U aST FULL g <br /> 1868 E. Hazelton Avenue I Stockton, California 95205 1 T 209 468-3420 1 F 209 464-0138 1 www.sjgov.org/EHD <br />