Laserfiche WebLink
Underground Storage Tank <br />Overfill Prevention Equipment Testing Report Form <br />6. OVERFILL PREVENTION EQUIPMENT DETAILS <br />Test Method Developed by ❑ Manufacturer 0 Industry Standard ❑ Professional Engineer <br />❑ Check this box if Appendix 7.1 continuation page is attached. <br />Tank ID (one OPE per column) <br />0001OU001 <br />Tank Manufacturer <br />Unknown <br />Tank Capacity (Gallons) <br />1002 <br />Tank Inside Diameter (Inches) <br />63.75" <br />Are both vent and tank riser piping <br />0 Yes <br />❑ Yes <br />❑ Yes <br />❑ Yes <br />secondarily contained? <br />❑ No <br />❑ No <br />❑ No <br />❑ No <br />OPE Manufacturer/ Model <br />Veeder-Root/546396-104 <br />What is the OPE response when activated? <br />❑ Shut off <br />❑ Shut off <br />❑ Shut off <br />❑ Shut off <br />(Check all that apply.) <br />❑ Restrict <br />El Restrict <br />❑Restrict <br />❑Restrict <br />0 Audible <br />❑ Audible <br />❑ Audible <br />❑ Audible <br />0 Visual <br />❑ Visual <br />❑ Visual <br />❑ Visual <br />Are flow restrictors installed on vent piping <br />❑ Yes* <br />❑ Yes* <br />❑ Yes* <br />❑ Yes* <br />that may interfere with the OPE operation? <br />N No <br />❑ No <br />❑ No <br />❑ No <br />For audible/visual overfill alarms, are they <br />0 Yes <br />❑ Yes <br />❑ Yes <br />❑ Yes <br />clearly audible/visible at the tank fill point? <br />❑ No <br />❑ No <br />❑ No <br />❑ No <br />At what level in the tank does the OPE <br />53.75" <br />activate? (Inches from bottom of tank) <br />What is the percent capacity of the tank at <br />90% <br />which the OPE activates? <br />Is the OPE in proper operating condition to <br />p Yes <br />❑ Yes <br />❑ Yes <br />❑ Yes <br />respond when the stored substance reaches <br />the designated regulatory level? <br />❑ No <br />El No <br />❑ No <br />❑ No <br />7. SUMMARY OF TEST RESULTS <br />OPE Test Results <br />I!] Pass <br />❑ Pass <br />❑ Pass <br />❑ Pass <br />❑ Fail <br />❑ Fail <br />❑ Fail <br />❑ Fail <br />8. COMMENTS <br />* ❑ Check this box if flow restrictors interfere with overfill prevention and repairs are required. <br />All tests marked "Fail" and any repairs made during the test must be described in Section 8. <br />Attach tank chart(s), measurements, calculations, and In -Tank Setup report(s) Page 2 of 2 <br />