My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SR2501037 (2)
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
D
>
DR MARTIN LUTHER KING JR
>
440
>
2900 - Site Mitigation Program
>
SR2501037 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2026 11:49:26 AM
Creation date
7/17/2026 11:46:59 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
SR2501037
PE
2900 - Site Mitigation Program
STREET_NUMBER
440
Direction
W
STREET_NAME
DR MARTIN LUTHER KING JR
STREET_TYPE
BLVD
City
STOCKTON
Zip
95206
APN
16503003
CURRENT_STATUS
Closed - Complete
QC Status
Approved
Scanner
SJGOV\gmartinez
Supplemental fields
Site Address
440 W DR MARTIN LUTHER KING JR BLVD STOCKTON 95206
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
53
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TABLE 1 <br /> Soil Boring and Well Construction Details <br /> Stockton Charter Way Commingled Plume <br /> 440, 441, and 508 West Charter Way, 1426 and 1444 South Lincoln Street, Stockton, CA <br /> TOC Borehole Casing Bentonite Seal Cement Seal Water- <br /> Installation Destruction Total Depth Casing Slot Size Screened Interval Filter Pack Interval <br /> Location ID Elevation Diameter Diameter Interval Interval Bearing Comments <br /> Date Date (feet) (feet bgs) (inches) (inches) Material (inches) (feet bgs) (feet bgs) (feet bgs) (feet bgs) Zone <br /> SMW-21-80 10/25/07 11.40 83 6 2 SCH.40 PVC 0.010 70-80 68-81 65.5-68,81-83 0-65.5 C <br /> SMW-22-80 10/26/07 11.94 81 8 2 SCH.40 PVC 0.010 70-80 68-81 65-68 0-65 C <br /> SMW-23 10/24/07 11.03 50 6 2 SCH.40 PVC 0.010 15-30 13-30,33-50 10-13,30-33 0-10 A <br /> SMW-24A 06/01/15 12.40 30 8.25 4 SCH.40 PVC 0.010 10.5-26 8-26 6-8;26-30 0-6 A <br /> SMW-24B 06/03/15 12.50 55.5 8.25 4 SCH.40 PVC 0.010 45-55.5 42-55.5 40-42 040 B <br /> SMW-25A 06/22/15 12.13 28 10 4 SCH.40 PVC 0.010 12-27 11-28 8-11 0-8 A <br /> SMW-25B 06/19/15 12.09 56.5 10 2 SCH.40 PVC 0.010 45.5-55.5 44-56.5 40-44 040 B <br /> SMW-26A 06/23/15 11.43 28 10 4 SCH.40 PVC 0.010 12-27 10-28 8-10 0-8 A <br /> SMW-26B 06/16/15 11.42 51 10 2 SCH.40 PVC 0.010 45-50 44-51 41-44 041 B <br /> SMW-27C 06/26/15 13.76 85.5 6.5 2 SCH.40 PVC 0.010 70-85 73-85.5 70-73 0-70 C <br /> SMW-27D 06/23/15 13.83 120 8.25 4 SCH.40 PVC 0.010 99.5-110 98-111 96-98;111-120 0-96 D <br /> SMW-28C 06/30/15 11.86 80 6.5 2 SCH.40 PVC 0.010 69-79.5 66.5-79.5 64.5-66.5 0-64.5 C <br /> SMW-28D 07/02/15 13.04 125.5 8.25 4 SCH.40 PVC 0.010 115-125.5 113-125.5 110.5-113 0-110.5 D <br /> SMW-29C 06/19/15 10.73 80 6.5 2 SCH.40 PVC 0.010 70-80 68-80 66-68 0-66 C <br /> SMW-29D 06/17/15 10.82 120 8.25 4 SCH.40 PVC 0.010 105-115 103-117 101-103;117-120 0-101 D <br /> SMW-30A 05/29/15 12.74 29.5 8.25 4 SCH.40 PVC 0.010 14.5-29.5 13-29.5 11-13 1-11 A <br /> SMW-31B 02/15/17 12.35 58 10 4 SCH.40 PVC 0.010 48-58 47-58 45-47 145 B <br /> SMW-32B 02/03/17 11.82 50 10 4 SCH.40 PVC 0.010 45-50 43-50 41-43 143 B <br /> SMW-33B 02/01/17 12.68 55 10 4 SCH.40 PVC 0.010 45-55 43-55 41-43 1-41 B <br /> SMW-35D 02/07/17 13.57 118 10 4 SCH.40 PVC 0.010 103-118 101-118 99-101 1-99 D <br /> SMW-35E 02/10/17 13.33 149.5 10 1 4 SCH.40 PVC 0.010 137-149.5 1 136-149.5 1 134-136 1 1-134 1 E <br /> Vapor Extraction Wells(SVEW) <br /> SVEW-1S 04/28/92 11.40 41.5 12 4 SCH.40 PVC 0.020 13.5-23.5 12.5-24 11-12.5 0-11 A Nested well <br /> SVEW-1 D 04/28/92 11.40 41.5 12 4 SCH.40 PVC 0.020 30.540.5 28-41.5 24-28 0-11 B Nested well <br /> SVEW-2S 04/27/92 11.69 41.5 12 4 SCH.40 PVC 0.020 15-25 14-26.5 12.5-14 0-12.5 A Nested well <br /> SVEW-2D 04/27/92 11.70 41.5 12 4 SCH.40 PVC 0.020 30.540.5 29.5-41.5 26.5-29.5 0-12.5 B Nested well <br /> SVEW-3S 04/28/92 11.68 41.5 12 4 SCH.40 PVC 0.020 15-25 14-25 12.5-14 0-12.5 A Nested well <br /> SVEW-3D 04/28/92 11.75 41.5 12 4 SCH.40 PVC 0.020 30.540.5 28.5-41.5 25-28.5 0-12.5 B Nested well <br /> SVEW-4S 04/27/92 11.79 40.5 12 4 SCH.40 PVC 0.020 15-25 14-26 12.5-14 0-12.5 A Nested well <br /> SVEW-4D 1 04/27/92 11.81 40.5 12 4 SCH.40 PVC 0.020 30.5-40.5 29.5-40.5 1 26-29.5 1 0-12.5 1 A Nested well <br /> ART Technology Wells <br /> ART-1 02/09/17 12.66 80 12 6 SCH.40 PVC 0.020&0.010 11.5-16.5&60-80 9.5-17.5&59-80 7.5-9.5&57-59 1-7.5&17.5-57 C Top screen in A <br /> ART-2 02/24/17 12.14 67 12 6 SCH.40 PVC 0.020&0.010 5-12&47-67 4-12&45-67 3-4&4345 1-3&1243 C Top screen in A <br /> ART-3 03/01/17 11.94 78 12 6 SCH.40 PVC 0.020&0.010 9-14&58-78 8-15&56-78 7-8&54-56 1-7&15-54 C Top screen in A <br /> ART-4 03/21/17 11.64 118.5 12 6 SCH.40 PVC 0.020&0.010 5-12.5&97.5-118.5 4-12.5&96.5-118.5 34&94.5-96.5 1-3&12.5-94.5 D Top screen in A <br /> ART-5 02/17/17 11.68 108 12 6 SCH.40 PVC 0.020&0.010 5-15&98-108 3-15&96-108 2-3&93.5-96 1-2&15-93.5 D Top screen in A <br /> ART-6 02/03/17 11.18 118 12 6 SCH.40 PVC 0.020&0.010 4-14&98-118 3-16&96-118 2-3&94-96 1-2&16-94 D Top screen in A <br /> ART-7 03/24/17 11.39 65 12 6 SCH.40 PVC 0.020&0.010 8-13&40-65 7-13&38-65 6-7&36-38 1-6&13-36 B Top screen in A <br /> ART-8 02/22/17 12.39 65 12 6 SCH.40 PVC 0.020&0.010 3-8&50-65 2-8&48-65 1-2&4648 0.5-1&8-46 B Top screen in A <br /> ART-9 Proposed N/A 90 12 6 SCH.40 PVC 0.020&0.010 5-10&70-90 3-10&68-90 1-2&66-68 0.5-1&12-66 C Top screen in A <br /> ART-10 Proposed N/A 90 12 6 SCH.40 PVC 0.020&0.010 5-10&70-90 3-10&68-90 1-2&66-68 0.5-1&12-66 C Top screen in A <br /> ART-11 Proposed N/A 120 1 12 1 6 SCH.40 PVC 0.020&0.010 5-10&100-120 1 3-10&98-120 1-2&96-98 0.5-1&12-96 C Top screen in A <br /> Stockton Charter Way Commingled Plume Soil Boring and Well Construction Details.xls Page 7 of 8 Stantec <br />
The URL can be used to link to this page
Your browser does not support the video tag.