My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SR2501037 (2)
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
D
>
DR MARTIN LUTHER KING JR
>
440
>
2900 - Site Mitigation Program
>
SR2501037 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2026 11:49:26 AM
Creation date
7/17/2026 11:46:59 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
SR2501037
PE
2900 - Site Mitigation Program
STREET_NUMBER
440
Direction
W
STREET_NAME
DR MARTIN LUTHER KING JR
STREET_TYPE
BLVD
City
STOCKTON
Zip
95206
APN
16503003
CURRENT_STATUS
Closed - Complete
QC Status
Approved
Scanner
SJGOV\gmartinez
Supplemental fields
Site Address
440 W DR MARTIN LUTHER KING JR BLVD STOCKTON 95206
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
53
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Proposed Remediation Well Installation Work Plan <br /> Stockton Charter Way Commingled Plume #CP0057 <br /> February 14, 2025 <br /> TABLE OF CONTENTS <br /> 1.0 INTRODUCTION ................................................................................................................ 1 <br /> 1.1 BACKGROUND............................................................................................................ 1 <br /> 1.2 SITE AND SURROUNDING AREA.................................................................................. 2 <br /> 1.3 CURRENT STATUS......................................................................................................... 2 <br /> 2.0 PROPOSED ART WELL INSTALLATION................................................................................. 3 <br /> 2.1 PRE-FIELD ACTIVITIES .................................................................................................. 3 <br /> 2.1.1 Health and Safety............................................................................................... 3 <br /> 2.1.2 Permitting and Utility Clearance ....................................................................... 3 <br /> 2.2 PROPOSED WELL INSTALLATION DETAILS ................................................................... 3 <br /> 2.2.1 Soil Samples....................................................................................................... 4 <br /> 2.2.2 Waste Handling and Disposal ........................................................................... 4 <br /> 2.2.3 Reporting............................................................................................................ 5 <br /> 3.0 PROPOSED ART WELL REMEDIATION ................................................................................. 5 <br /> 4.0 BBU AS/SVE REMEDIATION................................................................................................ 5 <br /> 5.0 LIMITATIONS....................................................................................................................... 6 <br /> LIST OF FIGURES <br /> Figure 1 Site Location Map <br /> Figure 2 Site Plan with Proposed Wells <br /> Figure 3 Site Plan with Piping Layout <br /> Figure 4 MTBE Groundwater Isoconcentration Contour Map C Zone - Fourth Quarter 2024 <br /> Figure 5 Benzene Groundwater Isoconcentration Contour Map A Zone- Fourth Quarter 2024 <br /> LIST OF TABLES <br /> Table 1 Soil Boring and Well Construction Details <br /> LIST OF APPENDICES <br /> Appendix A Regulatory Correspondence <br /> ® Stantec i <br />
The URL can be used to link to this page
Your browser does not support the video tag.