My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SR2501224
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAM
>
306
>
2900 - Site Mitigation Program
>
SR2501224
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2026 11:59:15 AM
Creation date
7/17/2026 11:56:08 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
SR2501224
PE
2900 - Site Mitigation Program
STREET_NUMBER
306
Direction
N
STREET_NAME
HAM
STREET_TYPE
LN
City
LODI
Zip
95242
APN
03710030
CURRENT_STATUS
Closed - Complete
QC Status
Approved
Scanner
SJGOV\gmartinez
Supplemental fields
Site Address
306 N HAM LN LODI 95242
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Lakewood Plaza Former Dry Cleaner, Lodi - 4 - 26 August 2024 <br /> Table 2 — Summar of Proposed SVE Wells <br /> Total Screened Casing Screen <br /> Well Location Depth Interval Diameter Slot Size <br /> ftb s ftb s in in <br /> SV-1 thru SV-4 Inside 308 unit of 15 3-15 <br /> building <br /> SVE-5, SVE-6 Parking lot east of 20 5-20 2 0.02 <br /> building <br /> SVE-7, SVE-8 Parking lot east of 30 10-30 <br /> buildin <br /> ft bgs= feet below ground surface; in= inches <br /> Table 3 — Summary of Proposed SVE System Parameters <br /> Blower Treatment Well Additional Pi ing System <br /> Manifold Equipment Indoor Outdoor Location <br /> 2x 800-Ibs Individual Condensation 2in PVC 2in PVC <br /> 200 coconut carbon separator & routed routed Parking lot <br /> connections east of <br /> cfm vapor-phase for each well entrapment above below <br /> filtration vessels chamber round round building <br /> cfm= cubic feet per minute; Ibs= pounds; in= inches <br /> Table 4 — Summary of Pilot Test Parameters <br /> Duration Week 1 Week 2 Weeks 3 thru 24 <br /> Extract from 1 of Extract from 1 of the 30ft Full-Scale operation utilizing <br /> 6 months the 15ft SVE well SVE wells various combinations of SVE <br /> Monitor induced vacuum in surrounding SVE wells as determined by on-going <br /> wells individual performance <br /> Table 5 — Sum mar of Proposed Pilot Test Monitoring <br /> Monitoring Induced System Extraction Vapor Monitoring <br /> Parameter Vacuum Operational Flow Rate PID Lab Lab <br /> Data Samples Analysis <br /> Wellhead of System Blower System Influent & <br /> Where Monitored un-utilized Equipment inlet Effluent <br /> SVE wells Readouts <br /> Week 1 Daily Daily Daily Daily Day 3, 5, <br /> and 7 VOCs <br /> Freq. Week 2 Daily Daily Daily Daily Day 10, <br /> 12, and 14 <br /> Remainder Weekly Weekly Weekly Weekly Every 3 <br /> weeks <br /> PID= photo-ionizing detector; VOCs= volatile organic compounds <br />
The URL can be used to link to this page
Your browser does not support the video tag.