My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU-2601423
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
TRACY
>
15888
>
2600 - Land Use Program
>
SU-2601423
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/12/2026 10:02:09 AM
Creation date
7/17/2026 3:36:25 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU-2601423
PE
2690 - LOT LINE ADJUSTMENT (LA)
STREET_NUMBER
15888
Direction
S
STREET_NAME
TRACY
STREET_TYPE
BLVD
City
TRACY
Zip
95304
APN
18924020
CURRENT_STATUS
Closed - Issued
QC Status
Approved
Scanner
SJGOV\gmartinez
Supplemental fields
Site Address
15888 S TRACY BLVD TRACY 95304
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Pacific Gas and <br /> Electric Company' <br /> 8. Streets and Roads:Access to facilities must be maintained at all times. Street lights may be <br /> allowed in the fee strip(s)and/or easement(s) but in all cases must be reviewed by PG&E for <br /> Proper clearance. Roads and utilities should cross the transmission easement as nearly at right <br /> angles as possible. Road intersections will not be allowed within the transmission easement. <br /> 9. Pipelines: Pipelines-may be allowed provided crossings are held to a minimum and to be as <br /> nearly perpendicular as possible. Pipelines within 25 feet of PG&E structures require review by <br /> PG&E. Sprinklers systems may be allowed; subject to review. Leach fields and septic tanks are <br /> not allowed. Construction plans must-be submitted to PG&E for review and approval prior to the <br /> commencement of any construction. <br /> 10.Signs: Signs are not allowed except in rare cases subject to individual review by PG&E. <br /> 11. Recreation Areas:Playgrounds, parks, tennis courts, basketball courts, barbecue and light <br /> trucks (pickups, vans, etc.)maybe allowed; subject to review of plans. Heavy equipment <br /> access-to PG&E facilities is to be maintained at all times. Parking is to clear PG&E structures by <br /> at least 10 feet. Protection of PG&E facilities from vehicular traffic is to be provided at <br /> developer's expense AND to PG&E specifications. <br /> 12. Construction Activity: Since construction activity will take place near PG&E's overhead <br /> _electric lines, please be advised it is the contractor's responsibility to be aware of, and observe <br /> the minimum clearances for both workers and equipment operating near high voltage electric <br /> lines set out in the-High-Voltage Electrical Safety Orders ofthe California Division of Industrial <br /> Safety(h"s-.//www.dir.ca.gov/Title8/sb5g2.litinl), as well as any other safety regulations. <br /> Contractors shall comply with California Public Utilities Commission General Order 95 <br /> (http://www.cpuc.ca.gov/gos/-GO95/go 95 startun pa eag html)-and all other safety rules. No <br /> construction may occur within 25 feet of PG&Es towers.All excavation activities may only <br /> commence after 811 protocols has been followed. <br /> Contractor shah-ensure the protection of PG&E's towers and poles from vehicular damage by <br /> (installing protective barriers) Plans for protection barriers must be approved by PG&E prior to <br /> construction. <br /> 13. PG&E is also the owner of distribution facilities throughout many of the areas within the <br /> state of California.Therefore, any plans that impact PG&E's facilities must be reviewed and <br /> approved by PG&E to ensure that no Impact occurs that may endanger the safe and reliable <br /> operation of its facilities. <br /> PG&E Gas and Electric Facilities Page 6 <br /> Internal <br />
The URL can be used to link to this page
Your browser does not support the video tag.