Laserfiche WebLink
C W. 0, <br /> sa.,4a feu„r� <br /> World 11g€ v You <br /> RECOMMENDATIONS: <br /> 1) An encroachment permit shall be required for all work within road right-of-way. (Note: <br /> Driveway encroachment permits are for flatwork only—all vertical features, including but <br /> not limited to fences, walls, private light standards, rocks, landscaping and cobbles are not <br /> allowed in the right-of-way.) (Development Title Sections 9-607.020 and 9-607.040) <br /> 2) The driveway approach shall be improved in accordance with the requirements of San <br /> Joaquin County Improvement Standards Drawing No. 13 prior to issuance of the <br /> occupancy permit. (Development Title Section 9-607.040) <br /> 3) The Traffic Impact Mitigation Fee shall be required for this application. The fee is due and <br /> payable at the time of grading permit application. The fee will be based on the current <br /> schedule at the time of payment. The fee shall be automatically adjusted July 1 of each <br /> year by the Engineering Construction Cost Index as published by the Engineering News <br /> Record. (Resolutions R-00-433) <br /> 4) The Regional Transportation Impact Fee shall be required for this application. The fee is <br /> due and payable at the time of grading permit application. The fee will be based on the <br /> current schedule at the time of payment. (Resolution R-06-38) <br /> 5) It is the responsibility of the applicant to ensure that a current will serve letter for Sewer, <br /> Storm, and Water service is on file prior to release of grading permit. The applicant or <br /> subsequent owner of the property is responsible to ensure that all requirements of the will- <br /> serve letter are fulfilled prior to release of the grading permit. If any extension, connection, <br /> or placement of new facilities is required to connect to the existing main lines, the cost shall <br /> be borne by the applicant. For any work within the County right-of-way, an improvement <br /> plan shall be submitted to Public Works for review and approval. Required plan check and <br /> inspection fees shall apply. <br /> 6) A copy of the Final Site Plan shall be submitted prior to release of grading permit. <br /> 7) This project is subject to the NPDES Region-Wide Permit requirements and shall comply <br /> with the following conditions. Prior to release of the grading permit, plans and calculations <br /> shall be submitted and approved by the Public Works Department—Water Resources <br /> Division (209-468-9360 or 209-468-9596): <br /> a) Treatment: A registered professional engineer shall design the site to treat the 85th <br /> percentile storm as defined in the County's 2023 Storm Water Quality Control Criteria <br /> Plan (SWQCCP). <br /> b) Hydromodification: A registered professional engineer shall design the site to comply <br /> with the volume reduction requirement outlined in the County's 2023 SWQCCP <br /> c) Trash: A registered professional engineer shall design the site to comply with the trash <br /> control requirement outlined in the County's 2023 SWQCCP. <br /> SAN JI <br /> CC UNTY <br /> �rF�r3IiIe5 zlrovv, itcie. ', <br />