My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HARNEY
>
17720
>
4400 - Solid Waste Program
>
PR0440058
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/29/2026 4:46:47 PM
Creation date
8/3/2026 3:46:54 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0440058
PE
4433 - LANDFILL DISPOSAL SITE
FACILITY_ID
FA0004518
FACILITY_NAME
***SST***NORTH COUNTY LANDFILL
STREET_NUMBER
17720
Direction
E
STREET_NAME
HARNEY
STREET_TYPE
LN
City
LODI
Zip
95240
APN
06512004
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\sballwahn
Supplemental fields
Site Address
17720 E HARNEY LN LODI 95240
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
138
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
and pumped using the positive displacement method in the presence of EHD <br /> inspector. <br /> 3.01 WELL INSTALLATION <br /> A. Well installation shall be in the presence of EHD inspectors. Contractor shall <br /> follow the guidelines for well inspection as specified herein. <br /> B. The Contractor shall measure the total depth of the borehole using a weighted <br /> sounding line or other method as agreed with the Engineer and EHD inspector. If <br /> heaving or cave-ins have taken place, then the Contractor shall clean out or <br /> re-drill the borehole before well installation. <br /> C. The Contractor shall ask for inspection by the Engineer of the casing, screen, <br /> and any other well construction materials prior to installation. <br /> D. The blank casing, well screens, bentonite seals and neat cement seals shall be <br /> installed in accordance with the following sequence: <br /> 1. Contractor shall estimate the length of casings needed and verify with the <br /> Engineer before lowering into the boring. Well casing shall be at least 5 feet <br /> above grade. <br /> 2. Contractor shall not use couplings, or glue to join well casings. <br /> 3. The monitoring well casing shall be fitted with a two-foot long sump below the <br /> well screen interval. <br /> 4. Casing centralizers shall be affixed to the well casing during assembly. A <br /> centralizer shall be placed above and below the well screen of the 2-inch casing. <br /> A centralizer shall be placed above the well screen of the 1-inch casing. <br /> Additional centralizers shall be placed at 40-foot spacing to maintain 2-inch <br /> separation between the borehole wall, monitoring well casing, and sounding pipe <br /> within the annular space. <br /> 5. Contractor shall connect and lower the well casing assembly gently. <br /> 6. If the well casing assembly is dropped, lowered abruptly, or for any other reason <br /> suspected of being damaged during placement, the well casing assembly shall <br /> be removed from the borehole for inspection by the Engineer. The need to <br /> inspect the casing will be at the sole judgment of the Engineer. <br /> 7. If the well casing rises after being placed in the borehole, the Contractor shall not <br /> place any drilling equipment such as drill pipe, hammers, etc. on the casing to <br /> prevent the casing from rising. Contractor shall notify the Engineer immediately <br /> of rising casing, and shall measure the amount of rise. <br /> 8. Contractor shall place the gravel envelope into the annular space around the <br /> screened interval through a tremie pipe. The tremie pipe shall be installed within <br /> North County G-15&G-16 San Joaquin County <br /> Groundwater Monitoring Well Specifications 7 Public Works Dept <br /> Solid Waste Division <br />
The URL can be used to link to this page
Your browser does not support the video tag.