Laserfiche WebLink
and pumped using the positive displacement method in the presence of EHD <br /> inspector. <br /> 3.01 WELL INSTALLATION <br /> A. Well installation shall be in the presence of EHD inspectors. Contractor shall <br /> follow the guidelines for well inspection as specified herein. <br /> B. The Contractor shall measure the total depth of the borehole using a weighted <br /> sounding line or other method as agreed with the Engineer and EHD inspector. If <br /> heaving or cave-ins have taken place, then the Contractor shall clean out or <br /> re-drill the borehole before well installation. <br /> C. The Contractor shall ask for inspection by the Engineer of the casing, screen, <br /> and any other well construction materials prior to installation. <br /> D. The blank casing, well screens, bentonite seals and neat cement seals shall be <br /> installed in accordance with the following sequence: <br /> 1. Contractor shall estimate the length of casings needed and verify with the <br /> Engineer before lowering into the boring. Well casing shall be at least 5 feet <br /> above grade. <br /> 2. Contractor shall not use couplings, or glue to join well casings. <br /> 3. The monitoring well casing shall be fitted with a two-foot long sump below the <br /> well screen interval. <br /> 4. Casing centralizers shall be affixed to the well casing during assembly. A <br /> centralizer shall be placed above and below the well screen of the 2-inch casing. <br /> A centralizer shall be placed above the well screen of the 1-inch casing. <br /> Additional centralizers shall be placed at 40-foot spacing to maintain 2-inch <br /> separation between the borehole wall, monitoring well casing, and sounding pipe <br /> within the annular space. <br /> 5. Contractor shall connect and lower the well casing assembly gently. <br /> 6. If the well casing assembly is dropped, lowered abruptly, or for any other reason <br /> suspected of being damaged during placement, the well casing assembly shall <br /> be removed from the borehole for inspection by the Engineer. The need to <br /> inspect the casing will be at the sole judgment of the Engineer. <br /> 7. If the well casing rises after being placed in the borehole, the Contractor shall not <br /> place any drilling equipment such as drill pipe, hammers, etc. on the casing to <br /> prevent the casing from rising. Contractor shall notify the Engineer immediately <br /> of rising casing, and shall measure the amount of rise. <br /> 8. Contractor shall place the gravel envelope into the annular space around the <br /> screened interval through a tremie pipe. The tremie pipe shall be installed within <br /> North County G-15&G-16 San Joaquin County <br /> Groundwater Monitoring Well Specifications 7 Public Works Dept <br /> Solid Waste Division <br />