My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HARNEY
>
17720
>
4400 - Solid Waste Program
>
PR0440058
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/29/2026 4:46:47 PM
Creation date
8/3/2026 3:46:54 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0440058
PE
4433 - LANDFILL DISPOSAL SITE
FACILITY_ID
FA0004518
FACILITY_NAME
***SST***NORTH COUNTY LANDFILL
STREET_NUMBER
17720
Direction
E
STREET_NAME
HARNEY
STREET_TYPE
LN
City
LODI
Zip
95240
APN
06512004
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\sballwahn
Supplemental fields
Site Address
17720 E HARNEY LN LODI 95240
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
138
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
settlement, Contractor shall place additional neat cement to a level as indicated <br /> in the construction figures. <br /> 20.Contractor shall install the well enclosure and surface completion only after the <br /> neat cement has hardened. <br /> E. Contractor shall record the following information on the Driller's Log: <br /> 1. Driller's lithologic log <br /> 2. Depth to first water <br /> 3. Depth to water-bearing zones <br /> 4. Total depth of borehole <br /> 5. Borehole diameter <br /> 6. Depth from ground surface to top and bottom of the well screen interval <br /> 7. Depth from ground surface to top of the gravel envelope <br /> 8. Depth from ground surface to top of the bentonite plug <br /> 9. Height above the ground surface of the top of the well casing <br /> 10.Height above the ground surface of the top of the steel protective casing. <br /> 3.02 SURFACE COMPLETION <br /> A. Contractor shall clean the well enclosure housing with high-pressure hot <br /> water/steam prior to installation to ensure that it is free of contamination. <br /> B. Contractor shall install well enclosure plumb. <br /> C. Contractor shall cut the well casing pipe to minimum required height. The well <br /> enclosure lid shall open and close smoothly providing space for pump discharge <br /> tubing and pump lead wires. <br /> D. Contractor shall remove the PVC end caps from the top of the casing and then <br /> install well plugs. <br /> E. Contractor shall place coarse sand in the annular space between the enclosure <br /> and the well casings. The sand shall be placed six inches below the top of the <br /> well casings. <br /> F. Contractor shall clean cement grout from the well casing and enclosure prior to <br /> painting. <br /> G. Contractor shall apply the final coat of paint on the enclosure and then shall label <br /> the enclosure with the well number provided by the Engineer after installation. <br /> H. Contractor shall install bollards plumb. <br /> North County G-15&G-16 San Joaquin County <br /> Groundwater Monitoring Well Specifications 9 Public Works Dept <br /> Solid Waste Division <br />
The URL can be used to link to this page
Your browser does not support the video tag.