Laserfiche WebLink
1. A minimum of three (3) well casing volumes are removed from the well. <br /> 2. Field water quality parameters have stabilized per the requirements of Section <br /> 3.03(I). <br /> PART 5 ACCEPTANCE <br /> A. County will accept wells installed in accordance to the specifications. County will <br /> not accept a well installed without EHD inspection. Contractor will be responsible <br /> for damage caused to the well casing due to negligence during drilling and, well <br /> installation, well development, and equipping. Contractor shall not drop any tools <br /> or bailers in the well casing. <br /> B. If the County rejects a well, then the Contractor shall: <br /> 1. Repair defective components of the well. If defective components are not <br /> repairable, then the Contractor shall abandon that well and install a new well, or <br /> re-drill the well found to be unacceptable, at no additional cost to the County. <br /> 2. Well abandonment shall be performed under separate permit from San <br /> Joaquin County EHD and per state and local requirements. <br /> PART 6 MEASUREMENT AND PAYMENT <br /> 6.01 GENERAL <br /> A. Payment shall be full compensation for labor, materials, tools, equipment <br /> overhead for each task or line item listed in the bid sheet. <br /> B. Partial payment will not be made for each project. <br /> C. Payment will be made after the acceptance of the wells by the County. <br /> 6.02 MOBILIZATION/DEMOBILIZATION <br /> A. Mobilization shall include: <br /> 1. Submitting and updating schedule <br /> 2. Providing submittals for review and approval <br /> 3. Coordinating all required inspections. <br /> 4. Delivering equipment and material to the work site <br /> 5. Providing job Foreman with a working cell phone and contract documents. <br /> 6. Providing portable sanitary facilities as needed. <br /> North County G-15&G-16 San Joaquin County <br /> Groundwater Monitoring Well Specifications 12 Public Works Dept <br /> Solid Waste Division <br />