Laserfiche WebLink
1. Purchasing or fabricating the well enclosure <br /> 2. Painting the well enclosure <br /> 3. Installing the well enclosure with the concrete well shirt <br /> 4. Inscribing the date and well No. on the concrete well skirt <br /> 5. Labeling the well enclosure <br /> 6. Installing well plugs and filling sand inside the well enclosure <br /> 7. Placing Class 11 A.B. around the well skirt <br /> 6.06 WELL DEVELOPMENT <br /> Well development includes completing all the work specified here-in, including <br /> providing the well development report to the Engineer. Well development will be <br /> based on the unit cost per well as quoted in the bid proposal. <br /> 6.07 WELL PUMP <br /> Payment for each well pump shall be per unit cost quoted in the bid proposal. <br /> Payment shall include full compensation for furnishing and installing, pump, <br /> motor, discharge tubing, motor leads, safety cable bracket, well cap and start up <br /> testing. <br /> 6.08 BOLLARDS <br /> A. Measurement for payment for installing bollards shall be per the number of <br /> bollards installed per the contract figures. <br /> B. Payment for installing bollards shall be per the unit cost quoted in the bid <br /> proposal. The unit price quoted shall include full compensation for installing <br /> bollards completely as shown on the contract figures and specified herein <br /> END OF SECTION <br /> North County G-15&G-16 San Joaquin County <br /> Groundwater Monitoring Well Specifications 14 Public Works Dept <br /> Solid Waste Division <br />