Laserfiche WebLink
1.0 BACKGROUND <br /> 1.1 PURPOSE <br /> This work plan presents the procedures for the installation of groundwater <br /> monitoring wells at North County Sanitary Landfill. (NCSL). <br /> 1.2 SITE DESCRIPTION <br /> NCSL is located at 17720 East Harney Lane, approximately nine (9) miles <br /> East of Lodi. It is an active Class III landfill, for non-hazardous municipal <br /> solid waste and inert waste. <br /> 1.3 WELL LOCATIONS <br /> The locations of the proposed wells are shown in Figure 5. Well <br /> installation work will not include drilling into refuse or contact with refuse. <br /> The well locations will be staked by the County prior to installation and <br /> may be adjusted in the field based on site conditions. The well will be <br /> surveyed by the County after installation. <br /> 1.4 UTILITIES CLEARANCE <br /> Prior to drilling, Contractor shall notify Underground Service Alert (USA). <br /> Well location will be adjusted as needed to meet utility and overhead <br /> power line clearance. <br /> 1.5 CONTRACTOR QUALIFICATION AND REQUIREMENTS <br /> A. Only one contractor shall be responsible for installing a complete and <br /> functional monitoring well as specified in this document: including the <br /> procurement of products, installation, labeling and developing. <br /> B. Contractor shall have a valid C-57 California State contractor's license. <br /> Contractor shall provide a copy of license with the bid proposal. <br /> C. Contractor may visit the work site by scheduling appointment with County. <br /> D. Contractor shall take all precautions necessary to protect existing structures. <br /> Any items that are damaged during the course of the work shall be repaired <br /> or replaced by the contractor at no cost to the County. <br /> E. Contractor shall install only material that is new and undamaged. <br /> Refurbished or used material is not acceptable. <br /> F. County will consider the project complete when all work has been completed, <br /> work site has been cleaned to the County's satisfaction. <br /> G. Contractor agrees to replace or repair, as new, any defective work or <br /> materials identified by the County within 12 months of final payment. <br /> G15&G16 Page 2 of 4 San Joaquin County <br /> NC-2026 Monitoring Wells Public Works/Solid Waste <br />