Laserfiche WebLink
Southeast Down Drains <br /> ,. T <br /> JO <br /> saw j4�� F# � - •- ��' : i r , �` yw ` ��°"`' y - <br /> Before After <br /> 4. Customer Haul Road <br /> The existing customer haul road from scale house to the disposal area is paved. <br /> Customer Haul Road <br /> I <br /> L <br /> Ya <br /> Ili <br /> G <br /> 5. Erosion /Sedimentation Control <br /> The existing side slopes of Modules 1-4 have established vegetation to provide <br /> erosion and sediment control. <br /> Erosion / Sedimentation Control <br /> Northeast side of Module 1-3 North side of Module 1 <br /> NC Winterization Plan Page 3 of 6 Printed 9/24/26 <br />