Laserfiche WebLink
�woc WO <br /> Wmkmn,;im Yon <br /> 2) Any driveway approach within San Joaquin County Public Right-of-Way shall be improved <br /> in accordance with the requirements of San Joaquin County Improvement Standards prior <br /> to issuance of the occupancy permit. (Development Title Section 9-607.040) <br /> 3) The Traffic Impact Mitigation Fee shall be required for this application. The fee is due and <br /> payable at the time of building permit application. The fee will be based on the current <br /> schedule at the time of payment. The fee shall be automatically adjusted July 1 of each <br /> year by the Engineering Construction Cost Index as published by the Engineering News <br /> Record. (Resolutions R-00-433) <br /> 4) The Regional Transportation Impact Fee shall be required for this application. The fee is <br /> due and payable at the time of building permit application. The fee will be based on the <br /> current schedule at the time of payment. (Resolution R-06-38) <br /> 5) The Water Supply Facilities Impact Mitigation Fee shall be required for this development. <br /> The fee is due and payable prior to issuance of the building permit. The fee will be based <br /> on the current schedule at the time of payment. (Development Title Section 9-803.020 and <br /> Resolutions R-91-327, R-94-185 and R-97-5) <br /> 6) The Flood Protection Development Impact Fee shall be required for this application. The <br /> fee is due and payable prior to issuance of the building permit. The fee will be based on the <br /> current schedule at the time of payment. (Resolution R-22-135) <br /> 7) It is the responsibility of the applicant to ensure that a current will serve letter for water <br /> service is on file prior to release of building permit. The applicant or subsequent owner of <br /> the property is responsible to ensure that all requirements of the will-serve letter are fulfilled <br /> prior to release of the building permit. <br /> 8) The developer shall provide drainage facilities in accordance with the San Joaquin County <br /> Development Standards. Retention basins shall be fenced with six (6)foot high chain link <br /> fence or equal when the maximum design depth is 18 inches or more. Required retention <br /> basin capacity shall be calculated and submitted along with a drainage plan for review and <br /> approval, prior to release of building permit. (Development Title Section 9-606) <br /> 9) A copy of the Final Site Plan shall be submitted prior to release of building permit. <br /> 10) This project is subject to the NPDES Region-Wide Permit requirements and shall comply <br /> with the following conditions. Prior to release of the building permit, plans and calculations <br /> shall be submitted and approved by the Public Works Department—Water Resources <br /> Division (209-468-9360 or 209-468-9596): <br /> a) Treatment: A registered professional engineer shall design the site to treat the 85th <br /> percentile storm as defined in the County's 2023 Storm Water Quality Control Criteria <br /> Plan (SWQCCP). <br /> SAN-nJOAUI <br /> COUNTY <br /> ( iwaives qrmvti I�.. _. <br />