Laserfiche WebLink
�wc, wO <br /> VVorkmn!,nor Ymi <br /> REQUIREMENTS: <br /> The applicant shall complete the following requirements before the Department of Public Works <br /> can support or deem complete the application for this project: <br /> 1) A traffic study shall be required to determine the impacts and mitigation of the <br /> proposed project. The developer shall deposit funds with the County for all costs, <br /> as estimated by the Department of Public Works Transportation Engineering <br /> Division, prior of Department of Public Works preparing or contracting for the <br /> required study. (Development Title Section 9-608.050) <br /> Upon satisfaction of the above requirements, the following Conditions of Approval shall apply. <br /> Additional and/or revised Conditions of Approval may be necessary based upon the completed <br /> application. <br /> RECOMMENDATIONS: <br /> 1) An encroachment permit shall be required for all work within road right-of-way. (Note: <br /> Driveway encroachment permits are for flatwork only—all vertical features, including but <br /> not limited to fences, walls, private light standards, rocks, landscaping and cobbles are not <br /> allowed in the right-of-way.) (Development Title Sections 9-607.020 and 9-607.040) <br /> 2) The Traffic Impact Mitigation Fee shall be required for this application. The fee is due and <br /> payable at the time of building permit application. The fee will be based on the current <br /> schedule at the time of payment. The fee shall be automatically adjusted July 1 of each <br /> year by the Engineering Construction Cost Index as published by the Engineering News <br /> Record. (Resolutions R-00-433) <br /> 3) The Regional Transportation Impact Fee shall be required for this application. The fee is <br /> due and payable at the time of building permit application. The fee will be based on the <br /> current schedule at the time of payment. (Resolution R-06-38) <br /> 4) The Water Supply Facilities Impact Mitigation Fee shall be required for this development. <br /> The fee is due and payable prior to issuance of the building permit. The fee will be based <br /> on the current schedule at the time of payment. (Development Title Section 9-803.020 and <br /> Resolutions R-91-327, R-94-185 and R-97-5) <br /> 5) The developer shall provide drainage facilities in accordance with the San Joaquin County <br /> Development Standards. Retention basins shall be fenced with six (6)foot high chain link <br /> fence or equal when the maximum design depth is 18 inches or more. Required retention <br /> basin capacity shall be calculated and submitted along with a drainage plan for review and <br /> approval, prior to release of building permit. (Development Title Section 9-606) <br /> SAN,JOAQUIN <br /> COUNTY— <br /> ! rcciness acorn ho'', <br />