Laserfiche WebLink
May 30, 2024 <br />ATTN:ROGER ANDRADE <br />KMC ARCHITECTS <br />2101 CAPITOL AVE. #100 <br />SACRAMENTO, CA 95816 <br />RE PROPOSED:KIPP: STOCKTON ELEMENTARY - SR0087924 <br />745 HOUSTON AVE. <br />STOCKTON, CA 95206 <br />Dear Mr. Andrade, <br />nee <br />Any item(s) inadvertently overlooked in the plan check process, which is not in compliance with applicable <br />State laws, and/or city or county ordinance codes, shall be constructed or reconstructed upon request of <br />the EHD. Inferior workmanship, equipment, or materials will not be accepted for the construction or <br />operation of a food facility. Any variance from the requirements outlined in this letter will require written <br />approval from the EHD. Approval of the submitted plans shall become null and void if the work authorized <br />is not commenced within 180 days from the date of approval, or the work authorized by such plans is <br />abandoned. In order to renew action on an expired plan approval, the applicant shall submit fees equal <br />to that of a new plan review. A copy of the approved plans shall be available on site at the time of final <br />inspection. <br />1868 E. Hazelton Avenue | Stockton, California 95205 | T 209 468-3420 | F 209 464-0138 | www.sjgov.org/ehd <br />This letter indicates San Joaquin County Environmental Health Department (EHD) approval of drawings <br />submitted for the proposed KIPP: STOCKTON ELEMENTARY SCHOOL - SR0087924, without <br />condition. <br />Environmental Health Department <br />Jasjit Kang, REHS, Director <br />Muniappa Naidu, REHS, Assistant Director <br />PROGRAM COORDINATORS <br />Jeff Carruesco, REHS, RDI <br />Willy Ng, REHS <br />Steven Shih, REHS <br />Elena Manzo, REHS <br />Natalia Subbotnikova, REHS <br />The EHD must be kept informed of the construction progress. A final inspection must be performed, <br />operating permit fees paid, and approval to operate granted prior to opening for business. All equipment <br />must be installed and thorough cleaning completed prior to the final inspection. Inspections must be <br />scheduled at least 48 hours in advance. Charges for additional inspections, re-inspections and/or <br />consultations may be assessed at the EHD hourly rate of $162 per hour. <br />SANJOAOUIN <br />-COUNTY— <br />Greatness grows here.