Laserfiche WebLink
W� <br /> 0 <br /> c� <br /> 40' 0' 20' 40' 80' 160' <br /> I I I I I . t U <br /> 1"=40' �� O <br /> 1" 0" 1/2" 1" 2" 4" F" <br /> LEGEND: o <br /> W w <br /> �N <br /> STABILIZED CONSTRUCTION ENTRANCE <br /> OEM...........m <br /> CONCRETE WASHOUT !. <br /> �O• y W y O <br /> FR FIBER ROLL FENCING O °3ti y y 'os <br /> o SAND BAG y <br /> 0 V W y <br /> N37°28'00"W y 2 <br /> 20.00' <br /> \'o°o CSC SS�ONAL FN� <br /> 31 <br /> y y \ <br /> 500.5 No. 71646 <br /> y F toeOF C Al \F <br /> 6 O <br /> W y 49M6 y y (jam y \ <br /> ° y y y y 7 o <br /> oOI y y y y <br /> 499.0/ , 8 501 <br /> N61°45'00"E y <br /> 29.90' y'� y y \ <br /> Q � 26 <br /> 01 , 27 10 <br /> 9�0 <br /> Ag <br /> 11 <br /> `N-` <br /> 7 � 28 -, o 'r \ <br /> CONSTRUCTION SITE MAINTENANCE NOTES: - 2 L <br /> 12 <br /> 1. GATHER ALL CONSTRUCTION DEBRIS ON A REGULAR BASIS AND PLACE THEM IN ,c• \ <br /> A DUMPSTER OR OTHER CONTAINER WHICH IS EMPTIED OR REMOVED ON A �A <br /> WEEKLY BASIS. WHEN APPROPRIATE, USE TARPS ON THE GROUND TO COLLECT / - 13 <br /> '� 5 <br /> FALLEN DEBRIS OR SPLATTERS THAT COULD CONTRIBUTE TO STORM WATER s'4 9.4 30 o <br /> POLLUTION. l s'a 14 <br /> 2. REMOVE ALL DIRT, GRAVEL, RUBBISH, REFUSE AND GREEN WASTE FROM THE <br /> STREET PAVEMENT, AND STORM DRAINS ADJOINING THE PROJECT SITE DURING 31 \ _ <br /> WET WEATHER. AVOID DRIVING VEHICLES OFF PAVED AREAS. s'o 15 <br /> 3. BROOM SWEEP THE PUBLIC STREET PAVEMENT ADJOINING THE PROJECT ON A <br /> DAILY BASIS. CAKED-ON MUD OR DIRT SHALL BE SCRAPED FROM THESE AREAS sOe 7" <br /> BEFORE SWEEPING. <br /> 4. CREATE A CONTAINED AND COVERED AREA ON THE SITE FOR THE PESTICIDES, ip — <br /> OR ANY OTHER MATERIALS USED ON THE PROJECT SITE STORAGE OF BAGS, ZOO oo J <br /> CEMENT, PAINTS, FLAMMABLE OILS, FERTILIZERS, THAT HAVE THE POTENTIAL / 3g0 0 of 17 s a <br /> FOR BEING DISCHARGED TO THE STORM DRAIN SYSTEM THROUGH BEING J <br /> WINDBLOWN OR IN THE EVENT OF A MATERIAL SPILL. \ / PP o <br /> a <br /> 5. NEVER CLEAN MACHINERY, TOOLS, BRUSHES, ETC. OR RINSE CONTAINERS INTO ° 0 18 ° w 0 o <br /> A STREET, GUTTER OR STORM DRAIN. REFUEL ALL CONSTRUCTION VEHICLES IN _ _ _ \ \ 0 50 '� , J rn <br /> ONE LOCATION AND CLEAN UP LEAKS, DRIPS AND SPILLS IMMEDIATELY. o °o O ~ Q Q <br /> 6. ENSURE THAT CONCRETE/GUNITE SUPPLY TRUCKS OR CONCRETE/PLASTERERS 19 \ W w Z o <br /> OPERATIONS DO NOT DISCHARGE WASH WATER INTO STREET GUTTERS OR J > 0 00 <br /> DRAINS. \ S, 0 a Lu V <br /> 7. THE CONTRACTOR SHALL MEET AND FOLLOW ALL NPDES REQUIREMENTS IN S y w <br /> EFFECT AT THE TIME OF CONSTRUCTION. <�S,s S \ 5 y Z o J <br /> 8. THE CONTRACTOR AND/OR HIS SUBCONTRACTORS SHALL PREVENT THE \ S \\ 21 0 0 <br /> FORMATION OF ANY AIRBORNE DUST NUISANCE AT ALL TIMES. THEY SHALL DO \ \\ \\ <br /> SO BY WATERING AND/OR TREATING THE SITE OF WORK, AND SHALL MAINTAIN \ \ 0" 0 <br /> DUST CONTROL EQUIPMENT ON THE SITE AT ALL TIMES DURING CONSTRUCTION <br /> AND UNTIL FINAL COMPLETION. THEY WILL BE REPSONSIBLE FOR ANY DAMAGE S \ 01 \ <br /> DONE BY DUST FROM THEIR CONSTRUCTION ACTIVITIES IN PERFORMING THE o W <br /> WORK UNDER THIS CONTRACT. THE PRICES FOR THE VARIOUS ITEMS OF WORK \ \ 1. 3 <br /> SHALL INCLUDE PROVIDED ADEQUATE DUST CONTROL, AS REQUIRED BY THE <br /> LOCAL AGENCY. o ° \ 501.08 / <br /> 9. SAND OR EQUAL ARE TO BE PLACED ON THE DOWNSTREAM SIDE OF THE CURB, \ 1.42 4 \ 492.1s <br /> GUTTER AND SIDEWALK . ° \ <br /> 5 .46 O <br /> p 9 3 .13 1 <br /> ° \ ACK <br /> 497.62 Z <br /> .6 .3 N O <br /> S880 21' "E — — Q <br /> 9 mo w a <br /> 500.68 W <br /> O <br /> Q N <br /> Q <br /> 500.81 <br /> 501.69 O } <br /> Z m <br /> 0 <br /> 501.14 PROJECT NO.: 22E-022 <br /> DRAWN BY: MA <br /> CHECKED BY: JB/RW N <br /> DATE: 7/23/2026 N <br /> • mm below SHEET N0.: 04 <br /> r <br /> 8H bdore you dig. <br /> C3 .0 0 <br /> 0 <br /> SHEET: 7 OF 7 <br /> O <br /> J <br /> 22E022_C1.0—Site.dwg ARCH D 24X36 <br />