Laserfiche WebLink
40' 0' 20' 40' 80' 160' $Mhefore you dig. Z �, <br /> o <br /> 1"=40' r--� <br /> 4) 1" 0" 1/2" 1" 2" 4" � z, <br /> l O <br /> LEGEND: <br /> Ww CA � <br /> QN <br /> MEN= <br /> ASPHALT • LOT LINE MARKER <br /> a TRAFFIC FLOW DIRECTION <br /> GRAVEL ROAD C30 SITE LIGHT SINGLE �O z <br /> W � O <br /> o RV UTILITY HOOKUP ••``�� �' <br /> GRAVEL STUB ,° <br /> ss SANITARY SEWER MANHOLE <br /> CONCRETE F__ BACKFLOW PREVENTER W W <br /> ►- GATE VALVE <br /> LANDSCAPING ® PICNIC TABLE <br /> - - PROPERTY LINE 0 N37°28'oo"W 2 <br /> 20.00' 0 4 2�Sa <br /> RV SPACES \'-'° BEACH ON AL <br /> LEVEE TOE 10' SETBACK LINE �G�W W - 3 0 0 0 2`�4o \°% ACCESS S �FSS� ��Gy <br /> ROAD CENTERLINE o W `�':V- W W ° WALKWAY Q�o�oaN K <br /> E ELECTRICAL 11 W W W 4 <br /> SD STORM, 2% MIN SLOPE W 3 a5.00'> \ \ - No. 71s46 <br /> SS SEWER, 2% MIN SLOPE / 5 `r�ql CIVIL <br /> W WATER 43/ E F OF CA1 \F" <br /> �R 0o'W \ toe <br /> � 499r4t, W W fT7� W \ O <br /> 16.00' Q <br /> o , <br /> " 8 W / <br /> GENERAL NOTES: N610 452000E W ,� 4 9 \ <br /> Q � 26 ; 0 \ <br /> 1. THESE PLANS SHOW EXISTING FEATURES INCLUDING BUT NOT LIMITED TO TREES, UTILITIES, AND ` N o'9 27 11 <br /> STRUCTURES THAT MAY BE AFFECTED BY THE CONSTRUCTION OR PLACEMENT OF THE PROPOSED ` / �0 10 <br /> ENGINEERED IMPROVEMENTS. THE CONTRACTOR WILL IMMEDIATELY NOTIFY THE ENGINEER IF THERE G0 /w , <br /> ARE ANY EXISTING FEATURES, WHETHER SHOWN OR NOT SHOWN ON THESE PLANS, THAT COULD IN ANY 7 / R2 5.00 0 6 \ 9 <br /> WAY BE IN POTENTIAL CONFLICT WITH THE DESIGN OF THESE PLANS.ALL WORK WITHIN THE VICINITY OF AnO� \ 28 49 <br /> A POTENTIAL CONFLICT SHALL CEASE UNTIL AN ADEQUATE AND APPROPRIATE SOLUTION IS DETERMINED <br /> BY THE ENGINEER AND APPROVED BY THE PUBLIC WORKS DEPARTMENT. <br /> 2. SHOULD IT APPEAR THAT THE WORK TO BE DONE, OR ANY MATTER RELATIVE THERETO, IS NOT 5 9 12 <br /> SUFFICIENTLY DETAILED OR EXPLAINED ON THESE PLANS, THE CONTRACTOR SHALL CONTACT PROJECT a \ <br /> ENGINEER, FOR SUCH FURTHER EXPLANATIONS AS MAY BE NECESSARY. \ ` - 13 BEACH <br /> op <br /> 3. QUALITY CONTROL PLAN: THE CONTRACTOR SHALL BE RESPONSIBLE FOR CONTROLLING THE QUALITY OF / 7 - 5 ACCESS <br /> MATERIAL ENTERING THE WORK AND THE WORK PERFORMED, AND SHALL PERFORM TESTING TO ENSURE s�Q 9.4 30 ' 0 WALKWAY <br /> CONTROL. PRIOR TO START OF WORK THE CONTRACTOR SHALL SUBMIT A QUALITY CONTROL PLAN THAT spa a <br /> MUST DESCRIBE THE METHODS AND FREQUENCY OF TESTING, IMPLEMENTATION OF CORRECTIVE s, - 14 <br /> ACTIONS AS NECESSARY,AND REPORTING OF TEST RESULTS, SPECIFIC TO EACH MATERIAL TO BE USED. 5.00 <br /> 31 11 � ' \ <br /> 4. ALL REVISIONS TO THIS PLAN MUST BE REVIEWED BY THE PUBLIC WORKS DEPARTMENT PRIOR TO s, \ 02 <br /> 15 <br /> CONSTRUCTION AND SHALL BE ACCURATELY SHOWN ON REVISED PLANS, STAMPED AND DISTRIBUTED BY / -9 o So9 d R20.00' <br /> THE ENGINEERING SERVICES DIVISION, PRIOR TO ACCEPTANCE OF THE WORK AS COMPLETE. soe 7, <br /> 5. NO TREES SHALL BE REMOVED UNLESS THEY ARE SHOWN AND NOTED TO BE REMOVED ON THE \cN <br /> IMPROVEMENT PLANS. IF ANY TREES ARE TO BE REMOVED, THE IMPROVEMENT PLANS MUST BE S o <br /> so 4 16 <br /> REVIEWED AND ACKNOWLEDGED BY THE COMMUNITY DEVELOPMENT DEPARTMENT. ALL TREES <br /> CONFLICTING WITH GRADING, UTILITIES, OR OTHER IMPROVEMENTS, OR OVERHANGING THE SIDEWALK <br /> OR PAVEMENT SO AS TO FORM A NUISANCE OR HAZARD, SHALL BE TRIMMED, PROPERLY TREATED AND / 39 .9 0� 17 <br /> SEALED.A TREE PERMIT MAY BE NECESSARY AND CAN BE OBTAINED FROM THE COMMUNITY / O 00, s <br /> DEVELOPMENT DEPARTMENT. <br /> 6. COMPACTION REQUIREMENTS (RELATIVE DENSITY PER ASTM D-1557): 0 18 0 IL w Z o <br /> A. EXISTING SUBGRADE: 90% IN THE TOP 12" FROM NATIVE OR CUT SURFACE \ 0 50 2 Q Lu Lo <br /> 19 <br /> B. TRENCH BACKFILL: o > 0_ J M <br /> 1. IN PUBLIC RIGHT-OF-WAY: PER CITY STANDARDS o 0 0 19 \ a Caj <br /> 2. IN LANDSCAPED AREAS: 85% IN THE TOP 12" FROM FINISHED GRADE, 90% BELOW 12" FROM LEVE \ J Lu 00 <br /> FINISH GRADE. SLOPE TOE a w W <br /> 3. IN BUILDING PADS: 90% FULL DEPT \ S 0 0 <br /> C. ROAD RIGHT-OF-WAYS: LEVEE TOE 10'SETBACK S y <br /> 1. PER CITY STANDARDS <�`sS \ S 1\ 5 o <br /> 2. IN PARKWAYS: 90% MIN. IN THE TOP 6" FROM FINISH GRADE, 85% BELOW 6" FROM FINISH \ \ S \ \\ 21 \ \ 0 <br /> GRADE. <br /> 7. APPLICABLE FEES TO BE PAID AND PERMITS REQUIRED SHALL BE OBTAINED BY THE CONTRACTOR \ <br /> BEFORE COMMENCEMENT OF CONSTRUCTION. \\ 10 2 o" <br /> 8. CONSTRUCTION CONTRACTOR AGREES THAT IN ACCORDANCE WITH GENERALLY ACCEPTED SS / 01 \ <br /> CONSTRUCTION PRACTICES, CONSTRUCTION CONTRACT WILL BE REQUIRED TO ASSUME SOLE AND O \ \ <br /> COMPLETE RESPONSIBILITY FOR JOB SITE WORKING HOURS,AND CONSTRUCTION CONTRACTOR <br /> 3 <br /> FURTHER AGREES TO DEFEND, INDEMNIFY AND HOLD THE DESIGN PROFESSIONAL HARMLESS FROM ANY <br /> AND ALL CONDITIONS DURING THE COURSE OF CONSTRUCTION OF THE PROJECT, INCLUDING SAFETY OF <br /> ALL PERSONS AND PROPERTY THAT THIS REQUIREMENT SHALL BE MADE TO APPLY CONTINUOUSLY AND \ <br /> NOT BE LIMITED TO NORMAL LIABILITY, REAL OR ALLEGED, IN CONNECTION WITH THE PERFORMANCE OF 0 LEVEE o 0 501.08 24 492.1s <br /> WORK ON THIS PROJECT, EXCEPTING LIABILITY ARISING FROM THE SOLE NEGLIGENCE OF THE DESIGN KEYNOTES: I SLOPE o� 11 Z7 <br /> PROFESSIONAL. <br /> 9. PRIOR TO ANY CORRECTIVE ACTION BY THE CONTRACTOR WHICH IS NECESSARY TO ALLEGED STAKING 5 .46 ,S o <br /> ERROR, THE CONTRACTOR SHALL NOTIFY RIDGELINE ENGINEERING FOR RE-STAKING AND VERIFICATION 1. (E) WELL \ 1 a o F��9 3 13 1 <br /> OF PREVIOUS STAKING. SHOULD ANY CORRECTIVE WORK BE DONE PRIOR TO NOTIFICATION, OR IF THE 2. (E) WELL 150 BUFFER �"� o A(�K ' ° v <br /> ORIGINIAL STAKING IS DONE BY OTHERS, RIDGELINE ENGINEERING ASSUMES NO LIABILITIES FOR THE 3. 24' WIDE TWO-WAY ASPHALT ROAD - I - `��'� 9 zo wo <br /> COSTS INCURRED FOR THIS WORK.WHERE IT HAS BEEN DETERMINED THAT ANY CORRECTIVE ACTION - �762 0 <br /> 4. 24' WIDE TWO-WAY GRAVEL ROAD \ S88°21' "E -�ooz� 6 Q�s - - _ 0 <br /> WILL REQUIRE FINANCIAL PARTICIPATION BY RIDGELINE ENGINEERING, THAT AMOUNT SHALL BE AGREED R5.00' N 0 <br /> TO BY RIDGELINE ENGINEERING IN WRITING PRIOR TO TAKING CORRECTIVE ACTION. FAILURE TO OBTAIN 5. 16' WIDE ONE-WAY GRAVEL ROAD �o w a <br /> WRITTEN ACCEPTANCE BY RIDGELINE ENGINEERING WILL NEGATE ALL REQUIREMENTS OF OUR 6. PULL-IN RV SPACE PER DETAIL 1, SHEET C1.1 \ 500.68 0 <br /> FINANCIAL ASSISTANCE. 7. PULL-THROUGH RV SPACE PER DETAIL 2, SHEET C1.1 0 af <br /> 10. RIDGELINE ENGINEERING HAS EXERCISED A REASONABLE AND ACCEPTABLE STANDARD OF CARE IN THE 8. OPEN SPACE: PICNIC AREA, SEE SHEET C1.1 FOR QUANTITIES \ 500.81 <br /> PREPARATION OF THESE PLANS. HOWEVER, THE DESIGN PROCESS INCLUDES ACTIVITIES OCCURRING 9. OPEN SPACE: BEACH AREA, SEE SHEET C1.1 FOR QUANTITIES \ / 501.69 p } <br /> AFTER PLAN SIGNATURE. THESE ACTIVITIES INCLUDE CALCULATION, PLAN CHECK AND VERIFICATIONS 10. SEPTIC AND TRASH DISPOSAL AREA. Z o <br /> DURING TE CONSTRUCTION. SHOULD PERSONS OTHER THAN RIDGELINE ENGINEERING PERFORM THE \ PROJECT NO.: 22E-022 <br /> CONSTRUCTION STAKING OPERATIONS, THEY SHALL INDEMNIFY THE RIDGELINE ENGINEERING FROM ANY 11. 12' SITE LIGHT, SEE ELECTRICAL PLANS FOR ADDITIONAL 501.14 0 <br /> DETAILS \ DRAWN BY: MA 01 <br /> DAMAGES RESULTING FROM FAILURE TO PERFORM THESE TASKS OR ANY EXPENSE OR DAMAGE RW CHECKED BY: JB\ � � <br /> RESULTING FROM OMISSION OR ERROR CONTAINED IN THE PLANS WHICH WOULD REASONABLY HAVE 12. LEVEE TOE SETBACK, ALL UTILITIES AND SITE FLATWORK TO BE 2 � N <br /> BEEN DISCOVERED AND CORRECTED BY RIDGELINE ENGINEERING. CLEAR OF 10' LEVEE TOE SETBACK LINE. \ DATE: 7/23/2026 N <br /> 11-1 <br /> 11. ALL APPLICABLE, CLEANOUTS, VALVE BOXES, PULL BOXES AND RELATED APPURTENANCE SUBJECTED TO / SHEET NO.: N <br /> VEHICULAR WHEEL LOADING SHALL BE CONSTRUCTED WITH A TRAFFIC (H20) LOAD RATING. <br /> 12. THE CONTRACTOR SHALL IMPLEMENT B.M.P. TO CONTROL ALL SOIL AND DUST FROM LEAVING THE SITE. c 1 ■0 0 <br /> 0 <br /> SHEET: 3 OF 7 <br /> 0 <br /> J <br /> 22E022_C1.0-Site.dwg ARCH D 24X36 <br />