Laserfiche WebLink
Fahmy, Gehane [EHD] <br />Categories:Green Category <br />1 <br />As shared previously, Starbucks has decided to make some design changes for this particular location <br />since its approval in 2024. The changes are primarily in terms of aesthetic with minor station swap out, of <br />which include the following: <br />You don't often get email from smin@valerioinc.com. Learn why this is important <br />Jeff and Gigi - <br />From: <br />Sent: <br />To: <br />Cc: <br />Subject: <br />Attachments: <br />Sean Min <smin@valerioinc.com> <br />Wednesday, March 4, 2026 12:09 PM <br />Fahmy, Gehane [EHD] <br />Valerio Entitlements <br />Re: AP2401106 - SBX MAIN & ATHERTON - Permit Amendment Inquiry <br />3036- 241015- SBX Main-Atherton- Health Approval Letter.pdf; 24598 <br />_Americas_NASCO.pdf; 24601_Americas_STONESOURCE.pdf; Composite_CP0056 <br />_SpecO.pdf <br />c Vi I £ <br />• Removal of overhead ice machine from ceiling bulkhead at cold bar station. Swapped for <br />additional counter ice bin, relocated oven, and suspended open wood shelving <br />• Engine (food prep area) wall covering and countertop finish (See attached) <br />o Backsplash: NASCO's Flatiron Ocra in Glossy finish / Grout: MAPEI 5079-COCOA <br />o Countertops: Stone Source's Porcelain Ceramic LAB COAL MATTE 12"x24" / DuPont's <br />Corian CP0056 Brushed Warm Grey . i‘i <br />• Restroom flooring, walls, and ceiling finishes <br />See clouded areas per renderings on Sheet 1551... DpOSG- Health Review