PREPARED FOR:
<br /> GENERAL CONSTRUCTION NOTES: ABBREVIATIONS: 00)
<br /> o
<br /> 1. PLANS ARE INTENDED TO BE DIAGRAMMATIC OUTLINE ONLY, UNLESS NOTED OTHERWISE. THE WORK SHALL INCLUDE FURNISHING
<br /> A.B. ANCHOR BOLT FDN. FOUNDATION SCH. SCHEDULE tko
<br /> MATERIALS, EQUIPMENT, APPURTENANCES AND LABOR NECESSARY TO COMPLETE ALL INSTALLATIONS AS INDICATED ON THE H
<br /> ABV. ABOVE F.O.C. FACE OF CONCRETE SHT. SHEET _ �
<br /> DRAWINGS. ACCA ANTENNA CABLE COVER ASSEMBLY F.O.M. FACE OF MASONRY SIM. SIMILAR U) co
<br /> 2. THE CONTRACTOR SHALL OBTAIN, IN WRITING, AUTHORIZATION TO PROCEED BEFORE STARTING WORK ON ANY ITEM NOT CLEARLY • �� LU co
<br /> ADD'L ADDITIONAL F.O.S. FACE OF STUD SPEC. SPECIFICATIONS w "'
<br /> DEFINED OR IDENTIFIED BY THE CONTRACT DOCUMENTS. A.F.F. ABOVE FINISHED FLOOR F.O.W. FACE OF WALL SQ. SQUARE Z) LL
<br /> 3. CONTRACTOR SHALL CONTACT USA(UNDERGROUND SERVICE ALERT)AT(800)332-2344, FOR UTILITY LOCATIONS, 48 HOURS BEFORE A.F.G. ABOVE FINISHED GRADE F.S. FINISH SURFACE S.S. STAINLESS STEEL > U
<br /> PROCEEDING WITH ANY EXCAVATION, SITE WORK OR CONSTRUCTION. ALUM. ALUMINUM FT.( ' ) FOOT (FEET) STD. STANDARD Q Q
<br /> Lu
<br /> 4. THE CONTRACTOR SHALL INSTALL ALL EQUIPMENT AND MATERIALS IN ACCORDANCE WITH MANUFACTURER'S RECOMMENDATIONS ALT. ALTERNATE FTG. FOOTING STL. STEEL C� m
<br /> UNLESS SPECIFICALLY INDICATED OTHERWISE, OR WHERE LOCAL CODES OR REGULATIONS TAKE PRECEDENCE. ANT. ANTENNA G. GROWTH (CABINET) STRUC. STRUCTURAL U Z Q
<br /> APPRX. APPROXIMATELY) GA. GAUGE TEMP. TEMPORARY • r--� Q �
<br /> 5. ALL CONSTRUCTION SHALL BE IN ACCORDANCE WITH THE IBC/ UBC'S REQUIREMENTS REGARDING EARTHQUAKE RESISTANCE, FOR, l__ J
<br /> ARCH. ARCHITECT(URAL) GI. GALVANIZE(D) THK. THICK(NESS) 4_4 Q LU
<br /> BUT NOT LIMITED TO, PIPING, LIGHT FIXTURES, CEILING GRID, INTERIOR PARTITIONS, AND MECHANICAL EQUIPMENT. ALL WORK MUST AWG. AMERICAN WIRE GAUGE G.F.I. GROUND FAULT CIRCUIT T.N. TOE NAIL 0
<br /> COMPLY WITH LOCAL EARTHQUAKE CODES AND REGULATIONS. BLDG. BUILDING INTERRUPTER T.O.A. TOP OF ANTENNA N
<br /> 6. REPRESENTATIONS OF TRUE NORTH, OTHER THAN THOSE FOUND ON THE PLOT OF SURVEY DRAWINGS, SHALL NOT BE USED TO BLK. BLOCK GLB. (GLU-LAM) GLUE LAMINATED BEAM T.O.C. TOP OF CURB N
<br /> IDENTIFY OR ESTABLISH BEARING OF TRUE NORTH AT THE SITE. THE CONTRACTOR SHALL RELY SOLELY ON THE PLOT OF SURVEY BLKG. BLOCKING GPS GLOBAL POSITIONING SYSTEM T.O.F. TOP OF FOUNDATION
<br /> DRAWING AND ANY SURVEYOR'S MARKINGS AT THE SITE FOR THE ESTABLISHMENT OF TRUE NORTH, AND SHALL NOTIFY THE BM. BEAM GRND. GROUND T.O.P. TOP OF PLATE (PARAPET)
<br /> ARCHITECT/ ENGINEER PRIOR TO PROCEEDING WITH THE WORK IF ANY DISCREPANCY IS FOUND BETWEEN THE VARIOUS ELEMENTS B.N. BOUNDARY NAILING HDR. HEADER T.O.S. TOP OF STEEL VENDOR:
<br /> OF THE WORKING DRAWINGS AND THE TRUE NORTH ORIENTATION AS DEPICTED ON THE CIVIL SURVEY. THE CONTRACTOR SHALL BTCW. BARE TINNED COPPER WIRE HGR. HANGER T.O.W. TOP OF WALL
<br /> ASSUME SOLE LIABILITY FOR ANY FAILURE TO NOTIFY THE ARCHITECT/ ENGINEER. B.O.F. BOTTOM OF FOOTING HT. HEIGHT TYP. TYPICAL 0
<br /> 7. THE BUILDING DEPARTMENT ISSUING THE PERMITS SHALL BE NOTIFIED AT LEAST TWO WORKING DAYS PRIOR TO THE B/U BACK-UP CABINET ICGB. ISOLATED COPPER GROUND BUS U.G. UNDER GROUND
<br /> ( " )
<br /> COMMENCEMENT OF WORK, OR AS OTHERWISE STIPULATED BY THE CODE ENFORCEMENT OFFICIAL HAVING JURISDICTION. CAB. CABINET IN. INCH(ES) U.L. UNDERWRITERS LABORATORYCANT. CANTILEVER(ED) INT. INTERIOR U.N.O. UNLESS NOTED OTHERWISE
<br /> ID
<br /> 8. DO NOT EXCAVATE OR DISTURB BEYOND THE PROPERTY LINES OR LEASE LINES, UNLESS OTHERWISE NOTED. C.I.P. CAST IN PLACE LB.(#) POUND(S) V.I.F. VERIFY IN FIELD P. MARSHALL &ASSOCIATES
<br /> 9. ALL (E) UTILITIES, FACILITIES, CONDITIONS, AND THEIR DIMENSIONS SHOWN ON THE PLAN HAVE BEEN PLOTTED FROM AVAILABLE CLG. CEILING L.B. LAG BOLTS W WIDE (WIDTH) :jl� A CENTERLINE COMMUNICATIONS COMPANY
<br /> RECORDS. THE ARCHITECT/ ENGINEER AND THE OWNER ASSUME NO RESPONSIBILITY WHATSOEVER AS TO THE SUFFICIENCY OR THE CLR. CLEAR L.F. LINEAR FEET (FOOT) W/ WITH 1000 HOLCOMB WOODS PKWY,SUITE 210
<br /> ACCURACY OF THE INFORMATION SHOWN ON THE PLANS, OR THE MANNER OF THEIR REMOVAL OR ADJUSTMENT. CONTRACTORS COL. COLUMN L. LONG(ITUDINAL) WD. WOOD ROSWELL,GA 30076
<br /> SHALL BE RESPONSIBLE FOR DETERMINING EXACT LOCATION OF ALL (E) UTILITIES AND FACILITIES PRIOR TO START OF
<br /> CONC. CONCRETE MAS. MASONRY W.P. WEATHERPROOF OFFICE(678)280-2325
<br /> CONSTRUCTION. CONTRACTORS SHALL ALSO OBTAIN FROM EACH UTILITY COMPANY DETAILED INFORMATION RELATIVE TO WORKING CONN. CONNECTION(OR) MAX. MAXIMUM WT. WEIGHT
<br /> SCHEDULES AND METHODS OF REMOVING OR ADJUSTING (E) UTILITIES. CONST. CONSTRUCTION M.B. MACHINE BOLT q CENTERLINE
<br /> 10. CONTRACTOR SHALL VERIFY ALL (E) UTILITIES, BOTH HORIZONTAL AND VERTICALLY, PRIOR TO THE START OF CONSTRUCTION. ANY CONT. CONTINUOUS MECH. MECHANICAL It PLATE, PROPERTY LINE ISSUE STATUS:d PENNY (NAILS) MFR. MANUFACTURER
<br /> DISCREPANCIES OR DOUBTS AS TO THE INTERPRETATION OF PLANS SHOULD BE IMMEDIATELY REPORTED TO THE ARCHITECT/ DBL. DOUBLE MIN. MINIMUM REV. DATE DESCRIPTION BY
<br /> ENGINEER FOR RESOLUTION AND INSTRUCTION, AND NO FURTHER WORK SHALL BE PERFORMED UNTIL THE DISCREPANCY IS DEPT. DEPARTMENT MISC. MISCELLANEOUS A 01/20/26 90%ZONING GJF
<br /> CHECKED AND CORRECTED BY THE ARCHITECT/ENGINEER. FAILURE TO SECURE SUCH INSTRUCTION MEANS CONTRACTOR WILL D.F. DOUGLAS FIR MTL. METAL B 03/11/26 REVISED 90%ZONING FIR
<br /> HAVE WORKED AT HIS/HER OWN RISK AND EXPENSE. DIA. DIAMETER (N) NEW C 04/01/26 100%ZONING FIR11. ALL NEW AND (E) UTILITY STRUCTURES ON SITE AND IN AREAS TO BE DISTURBED BY CONSTRUCTION SHALL BE ADJUSTED TO FINISH DIAG. DIAGONAL NO.(#) NUMBER J:D 04/27/26 100%ZONING FR
<br /> NOT TO SCALE
<br /> DIMENSION N.T.S.
<br /> ELEVATIONS PRIOR TO FINAL INSPECTION OF WORK. DIM. E 07/30/26 REVISED 100%ZD RFB
<br /> 12. ANY DRAIN AND/OR FIELD TILE ENCOUNTERED/DISTURBED DURING CONSTRUCTION SHALL BE RETURNED TO IT'S ORIGINAL DWG. DRAWING(S) O.C. ON CENTER
<br /> CONDITION PRIOR TO COMPLETION OF WORK. SIZE, LOCATION AND TYPE OF ANY UNDERGROUND UTILITIES OR IMPROVEMENTS SHALL DWL. DOWEL(S) OPNG. OPENINGEA. EACH P/C PRECAST CONCRETE
<br /> BE ACCURATELY NOTED AND PLACED ON "AS-BUILT" DRAWINGS BY GENERAL CONTRACTOR, AND ISSUED TO THE ARCHITECT/ EL. ELEVATION PCs PERSONAL COMMUNICATION
<br /> ENGINEER AT COMPLETION OF PROJECT. ELEC. ELECTRICAL SERVICES
<br /> 13. ALL TEMPORARY EXCAVATIONS FOR THE INSTALLATION OF FOUNDATIONS, UTILITIES, ETC., SHALL BE PROPERLY LAID BACK OR ELEV. ELEVATOR PLY. PLYWOOD
<br /> BRACED IN ACCORDANCE WITH CORRECT OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION (OSHA) REQUIREMENTS. EMT. ELECTRICAL METALLIC TUBING PPC POWER PROTECTION CABINET
<br /> 14. INCLUDE MISC. ITEMS PER VERIZON SPECIFICATIONS E.N. EDGE NAIL PRC PRIMARY RADIO CABINET
<br /> ENG. ENGINEER P.S.F. POUNDS PER SQUARE FOOT
<br /> EQ. EQUAL P.S.I. POUNDS PER SQUARE INCH
<br /> EXP. EXPANSION P.T. PRESSURE TREATED
<br /> EXST.(E) (E) PWR. POWER (CABINET) LICENSOR:
<br /> EXT. EXTERIOR QTY. QUANTITY
<br /> APPLICABLE CODES, REGULATIONS AND STANDARDS: FAB. FABRICATION(OR) RAD.(R) RADIUS
<br /> F.F. FINISH FLOOR REF. REFERENCE
<br /> 1. SUBCONTRACTOR'S WORK SHALL COMPLY WITH ALL APPLICABLE NATIONAL, STATE, AND LOCAL CODES AS ADOPTED BY THE F.G. FINISH GRADE REINF. REINFORCEMENT(ING)FIN. FINISH(ED) REQ'D/ REQUIRED
<br /> LOCAL AUTHORITY HAVING JURISDICTION (AHJ) FOR THE LOCATION. FLR. FLOOR RGS. RIGID GALVANIZED STEEL
<br /> 2. THE EDITION OF THE AHJ ADOPTED CODES AND STANDARDS IN EFFECT ON THE DATE OF CONTRACT AWARD SHALL GOVERN
<br /> THE DESIGN.
<br /> 3. SUBCONTRACTOR'S WORK SHALL COMPLY WITH THE LATEST EDITION OF THE FOLLOWING STANDARDS: SYMBOLS LEGEND:
<br /> 3.1. AMERICAN CONCRETE INSTITUTE (ACI) 318, BUILDING CODE REQUIREMENTS FOR STRUCTURAL CONCRETE
<br /> 3.2. AMERICAN INSTITUTE OF STEEL CONSTRUCTION (AISC), MANUAL OF STEEL CONSTRUCTION, ASD, NINTH EDITION IT IS A VIOLATION OF LAW FOR ANY
<br /> 3.3. TELECOMMUNICATIONS INDUSTRY ASSOCIATION (TIA)222-G, STRUCTURAL STANDARD FOR STRUCTURAL ANTENNA TOWER GROUT OR PLASTER PERSONS, UNLESS THEY AREACTING UNDER THE DIRECTION
<br /> AND ANTENNA SUPPORTING STRUCTURES A-3oo A-3oo BLDG. SECTION (E) BRICK OF A LICENSED PROFESSIONAL
<br /> 3.4. INSTITUTE FOR ELECTRICAL AND ELECTRONICS ENGINEERS (IEEE)81, GUIDE FOR MEASURING EARTH RESISTIVITY, GROUND ENGINEER, TO ALTER THIS
<br /> IMPEDANCE, AND EARTH SURFACE POTENTIALS OF A GROUND SYSTEM IEEE 1100 (1999) RECOMMENDED PRACTICE FOR (E) MASONRY DOCUMENT
<br /> POWERING AND GROUNDING OF ELECTRICAL EQUIPMENT. A5 WALL SECTION e CONCRETE
<br /> A-310 PROJECT NAME:
<br /> 3.5. IEEE C62.41, RECOMMENDED PRACTICES ON SURGE VOLTAGES IN LOW VOLTAGE AC POWER CIRCUITS (FOR LOCATION EARTH
<br /> CATEGORY"C3"AND "HIGH SYSTEM EXPOSURE")
<br /> 3.6. TIA 607 COMMERCIAL BUILDING GROUNDING AND BONDING REQUIREMENTS FOR TELECOMMUNICATIONS TELCORDIA GR-63 D5 DETAIL GRAVEL
<br /> A-500
<br /> NETWORK
<br /> PLYWOOD
<br /> 3.7. EQUIPMENT-BUILDING SYSTEM (NEBS): PHYSICAL PROTECTION C1
<br /> 3.8. TELCORDIA GR-347 CENTRAL OFFICE POWER WIRING A-113 SAND O 0 CD3.9. TELCORDIA GR-1275 GENERAL INSTALLATION REQUIREMENTS A4 C4 ELEVATION � N
<br /> N
<br /> 3.10. TELCORDIA GR-1503 COAXIAL CABLE CONNECTIONS A-113 A-113 PLYWOOD TOM
<br /> 3.11. ANY AND ALL OTHER LOCAL& STATE LAWS AND REGULATIONS (0A-113 SAND = V
<br /> 3.12. FOR ANY CONFLICTS BETWEEN SECTIONS OF LISTED CODES AND STANDARDS REGARDING MATERIAL, METHODS OF
<br /> CONSTRUCTION, OR OTHER REQUIREMENTS, THE MOST RESTRICTIVE SHALL GOVERN. WHERE THERE IS CONFLICT (E) STEEL n O
<br /> BETWEEN A GENERAL REQUIREMENT AND A SPECIFIC REQUIREMENT, THE SPECIFIC REQUIREMENT SHALL GOVERN. 001 DOOR SYMBOL MATCH LINE V LV a
<br /> 10 WINDOW SYMBOL GROUND CONDUCTOR V � U
<br /> OH — � � Q
<br /> TILT-UP PANEL MARK OVERHEAD SERVICE CONDUCTORS
<br /> Tel TELEPHONE CONDUIT
<br /> PROPERTY LINE
<br /> Pwr POWER CONDUIT
<br /> CENTERLINE
<br /> Coax COAXIAL CABLE
<br /> +0" ELEVATION DATUM CHAIN LINK FENCE
<br /> A GRID/COLUMN LINE WOOD FENCE
<br /> SHEET TITLE:
<br /> KEYNOTE, DIMENSION ITEM (P) ANTENNA GENERAL NOTES
<br /> (P) RRU
<br /> LEGEND &
<br /> KEYNOTE, CONSTRUCTION ITEM (P) DC SURGE SUPPRESSION ABBREVIATIONS
<br /> 2 -��
<br /> WALL TYPE MARK L J (F) ANTENNA
<br /> (F) RRU
<br /> OFFICE ROOM NAME
<br /> 710-11 ROOM NUMBER (E) EQUIPMENT T=2
<br />
|